Fix the Close Isochronous Event (CIE) implementation so that
it follows the Bluetooth Core Specification definition:
Link Layer implementations will normally end a CIS event
early when all scheduled payloads in both directions have
been transmitted and acknowledged.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Rename lll_df_conf_cte_tx_disable() to lll_df_cte_tx_disable()
so that it can be used as a common function between connection
and connectionless implementations.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add a DSB before doing WFE in cpu_sleep(), to ensure the
memory transactions are complete.
Add a note clarifying a dependency for the existing solution
(dependency is satisfied by ARCH code but is good to state
clearly).
Relates to commit f1264b7e47 ("drivers: entropy: nrf5: add
docs and a DSB in get_entropy_isr").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fixing typo in llcp_lp_cc_established revealed the need for completing
the CIS establishment procedure by additional call to local/remote
check_done function.
Fixed by exposing lr_check_done and rr_check_done with naming update and
calling after injecting the CIS_ESTABLISHED event.
Signed-off-by: Morten Priess <mtpr@oticon.com>
If CIS offset in LL_CIS_IND is less than EVENT_OVERHEAD_START_US, the
controller is not able to establish the CIS in the ACL connection event
specified, but needs to start setup one connection event earlier.
With this commit, if offset is larger than EVENT_OVERHEAD_START_US the
first CIS event can be prepared in due time immediately.
This enables the controller to setup first CIS, even when instant is
equal to the ACL event_counter.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Fix Periodic Advertising time reservation when enabling with
ADI support. As the PDU is updated, use the updated PDU to
calculate the time reservation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation to schedule BIG events after Periodic
Advertising when Periodic Advertising is enabled after
Extended Advertising has already been enabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
As the range of ticker_id has been checked, context specific
get interface be used instead of doing range check again in
ull_hdr_get_cb().
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix auxiliary PDU time reservation calculation to reserve
for possible increase in PDU len due to updates to data in
the Common Extended Header Format of the PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix assertion due to delayed prepare of first BIG event when
supporting encryption. Crypto calculation introduce extra
processing delay causing the scheduling of first BIG event
to be delayed. Detect such delay and skip to next ISO
interval.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix the access address and radio ready timestamp to derive
the value of the first subevent, so that correct anchor
point reference is used in scheduling subsequent subevents.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix uninitialized CIS LLL structure member variables,
uninitialised CIS acl_handle causes HCI command disallowed
for acl_handle's other than 0x0000.
Initialize other variables like sn, nesn etc. when create
CIS control procedure is performed.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Redefine mask of host-controlled feature bits to include only features
that are supported by the controller. This fixes a conformance test
failure where setting an unsupported host-controlled feature bit was
not rejected as it should.
Set the Connected Isochronous Streams (Host Support) bit from the host
only if unicast support is configured to avoid failures in
broadcast-only configurations.
Signed-off-by: Wolfgang Puffitsch <wopu@demant.com>
Fix advanced scheduling to consider active BIG events when
establishing new Central connections. This will schedule
AUX_ADV_IND, AUX_SYNC_IND and Central connections of similar
interval to be non-overlapping.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Update advanced scheduling implementation to consider other
active BIG events when scheduling new BIG instances.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix sn and nesn values of ISO data when starting a new burst.
When central retransmitted but did not get an ack, it did
not update the sn correctly causing the peripheral to drop
the next ISO data PDU.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The address type in the periodic adveritising sync
established event is incorrectly set to 0x01
(BT_ADDR_LE_RANDOM) when the address is a resolved one,
where it should have been BT_ADDR_LE_RANDOM_ID.
The address type has been fixed by offsetting by 2 to get
BT_ADDR_LE_PUBLIC_ID or BT_ADDR_LE_RANDOM_ID when the
address has been resolved.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing DF related Radio register reset on radio_reset().
Regression in commit 465a96181d ("Bluetooth: Controller:
Explicitly set all bits of used radio registers") due to the
removal of NRF_RADIO->POWER register use that was used to
reset all Radio registers on every new Radio Event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Workaround sequence number misalignment to ISO event count
when ISO data is supplied in bursts, example through USB.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Remove BT_HCI_DATAPATH_ID_DISABLED define as 0xFF, which is
reserved for future value for Data_Path_Id parameter.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
- Include ISO stream count in ISO streams definitions in
controller.
- Create ISOAL source on controller when ISO data path is
setup.
- Send broadcast data buffers transferred from host over
HCI to ISOAL as ISO SDU fragments.
- Allow bot conn and ISO data to use data_buf_overflow.
- Store ISO interval during BIG create.
- Remove ISO data path for each BIS during BIG terminate
procedure.
- Set value (temporarily) for ISOAL target_event enabling
it to Tx data.
- Check status of data fragment sent to ISOAL for memory
allocation and other errors.
- Destroy ISOAL source when ISO stream released.
- Use ISO Advertising handle, not stream handle to destroy
ISO data path.
- Remove extra ISOAL sink destroy call when removing ISO
data path.
- Add FIXME comment as reminder to address LL_ASSERT on
isoal_status error.
Signed-off-by: Carl Stehle <droid@appception.com>
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix calculation of ISO interval such that multiple bursts
can be transmitted per ISO interval. This means we can now
have SDU_Interval < ISO_Interval and more than one SDU will
be transmitted in each ISO_Interval.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing jump to Rx ISR done that caused the Control PDU
to be enqueued as ISO data PDU, causing the ISOAL to assert
on receiving invalid LLID.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ISO timestamp wrap around which caused ISOAL to assert
checking for valid timestamp.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Define a internal BT_CTLR_ISO_TX_BUFFERS to allocate ISO Tx
buffers used for Broadcast and Connected ISO.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix race between isoal_source_deallocate() and
isoal_tx_pdu_emit(). Initiating a local initiated terminate
triggers NULL pointer dereference.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor ll_setup_iso_path to support Synchronous Receiver
and Connected ISO to be built together.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix uninitialized CIG ULL reference count when creating a
CIG after a previous disconnection.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix CIS and CIG teardown in Central and Peripheral Role.
cig->lll.num_cis value is used in peripheral role to count
active CISes, and cig->cis_count is used in central role.
Both central and peripheral will stop ticker for CIG when
num_cis and/or cis_count is zero, respectively, but only
peripheral role will release a CIG context. The Central
will keep the CIG context allocated and only mark it as
not started. Remove CIG command will be used for central
role to release a CIG context.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix CIS ISO Tx buffer leak on terminate when the datapath
has been deallocated.
Add a FIXME comment regarding ll_tx_ack_put() being called
from LLL execution context, while it is a ULL callable used
by ACL connections to dispatch ack.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Do not call util_aa_le32() from ISR context as random number
generation in entropy driver on nRF5x series invokes
k_sem_take.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix assertion check on link_tx_free when CIS is created a
second time. The Tx mem queue has to be initialized on every
new CIS create as CIS disconnect does the deinitialization.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Reorder the functions in ull_central_iso file to match the
order of HCI commands in the BT Spec.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Workaround the access that check if datapath is NULL when
the stream has already been released. Memory Pool overwrites
first 8 bytes to maintain the free list and free count. This
causes the datapath fields if placed in the first 8 bytes to
not be NULL after the memory is freed.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add code to generate ISO data buffer overflow event if more
than allocated ISO data PDU buffers are tried to be
requested by host or for SDU fragmentation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use instant_latency at the CIG start event count to detect
skipped connection event around the instant. In the future
add implementation to compensate for skipped ACL connection
event and adjust the CIS event count at CIG start.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Reuse ull_conn_event_counter() function in LLCP
implementation to get the current radio event counter value.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix CIG offset such that it follows after the ACL connection
time reservation to avoid overlapping.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add LLL interfaces implemented by ULL to get group by stream
and to get stream by group iterator functions.
Rename function to set CIS established to reflect that it is
LLL accessible.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix channel indices calculation implementations conditional
compile so that it can be reused for Connection ISO events
and subevents.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add interface to have separate Tx and Rx packet timer status
reset, so that packet timer can be setup ahead in time for
starting the Tx or Rx subevent and status reset only clears
the respective PPI/DPPI that was used when Tx or Rx
completes.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use BT Spec. defined abbreviations for number of subevents
(nse), burst number (bn), flush timeout (ft) etc.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Update Kconfig to list Central and Peripheral ISO as
supported. Will continue to be listed as Experimental.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add conditional compilation for Peripheral ISO support,
use CONFIG_BT_CTLR_PERIPHERAL_ISO.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Re-arrange include in ull_peripheral_iso file to be
consistent with other similar files (ull_central_iso).
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Rename LAST_VALID_CIS_HANDLE to LL_CIS_HANDLE_LAST, to be
consistent naming with LL_CIS_HANDLE_BASE.
Add IDX_FROM_HANDLE defines.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor the Connected ISO group and Connected ISO stream
context to be consistent in defining the bitfields and also
rearrange structure members.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing BT_LL_SW_LLCP_LEGACY cond compile causing
compile error when building Peripheral ISO samples with
legacy control procedure implementation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When a maximum duration or number of advertisements has been set for an
advertisement set, we will exceed that limit if the last advertisements
happen to be overlapping (ie. we have two primary advertisements pointing
to the same AUX_ADV_IND).
We now have a check in the ticker_cb that will ignore the callback if the
state is such that advertisement would have been stopped if ull_adv_done()
had been allowed to run in the meantime.
Signed-off-by: Troels Nilsson <trnn@demant.com>
Implementation of Broadcast ISO encryption using crypto
toolbox function h8. And support for encryption in lower
link layer for nRF5x series.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Make Data, ISO, BIS and CIS PDU structure's octet 3 vendor
specific.
This will allow vendors not supporting the octet 3 or
CTEInfo (8 bits) to save 1 octet in their PDU structures.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation to parse ACAD and find the BIGInfo before
setting up Broadcast ISO Synchronization.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The nRF HW models have been updated to correspond to a 52833 instead
of a 52832. Let's follow them.
The motivation for the change is to enable proper BIS encryption support
(for BT LE Audio ISO).
Changes:
* Point in manifest to latest HW models
* SOC_COMPATIBLE_NRF52832 has been removed, and SOC_COMPATIBLE_NRF52833
added in its place (with no uses at this point)
* Where SOC_COMPATIBLE_NRF52832 was used to set encryption like for a 52832
(to avoid using the MAXPACKETLENGHT), we set the condition to just
SOC_NRF52832.
Note: The MAXPACKETLENGHT register exists in the new simulated nrf52833,
thought it does nothing.
* In the BLE ctrl LLL radio HAL, all macros are renamed accordingly
(timings are NOT changed).
* Board dts definition now refers to the 52833 soc definition. New 52833
features set as not supported by now.
Signed-off-by: Alberto Escolar Piedras <alberto.escolar.piedras@nordicsemi.no>
Legacy Control Procedure fix. Fix missing release of the
node rx allocation that was reserved at the start of the
LE Connection Parameter Request procedure and the procedure
ends with reject indication transmitted to the initiating
peer.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix filter accept list and privacy feature Kconfig default
based on whether host has them enabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When removing a CIG, the instance and associated CIS instances were not
always released. This causes repeated Create_CIG/Remove_CIG operations
to fail assertion with resource error.
Enables CONFIG_BT_CTLR_CENTRAL_ISO in bsim_test_audio.
Fixes issue #53301.
Signed-off-by: Morten Priess <mtpr@oticon.com>
New LLCP will process the CIS establishement in the TX path, meaning it
will only process once every ACL connection interval.
If ACL connection interval is significantly longer than the ISO
interval, CIS packets corresponding to the ACL connection interval will
be lost. This may cause latency in audio rendition.
By processing the CIS establishment in the RX path, notification will be
sent immediately, and audio path is enabled fast to reduce latency.
When a CIS fails to establish, the controller shall complete the
procedure by sending a CIS_ESTABLISHED event containing the error.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Disconnect CIS immediately if event done extra status indicates MIC
failure. Return reason BT_HCI_ERR_TERM_DUE_TO_MIC_FAIL.
Fixes EBQ test /LL/CIS/PER/BV-27-C.
Signed-off-by: Morten Priess <mtpr@oticon.com>
When the 'instant' of a CIS is postponed by increasing the conn_event of
the CIS_RSP compared to CIS_REQ, the CIS offset shall be calculated as
an equivalent window offset by an integer number of ISO intervals.
This is obtained by increasing the CIS_Offset_Min and CIS_Offset_Max by
the modulus of the connection interval delay time.
Signed-off-by: Morten Priess <mtpr@oticon.com>
To be able to timely start the first CIS/CIG, if the requested instant
is the next connection event, call ull_peripheral_iso_start directly
from rp_cc_state_wait_rx_cis_ind instead of waiting for next time
through the state machine.
To enable ULL/LLL to prevent adding latency when LLCP is waiting for
instant, local- and remote procedures with instant now expose a function
for checking this state.
Fixed event_counter function to prevent one-off in RX path. Unified to
use single function ull_conn_event_counter.
Fixed LLCP unit tests and added new mock function.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Add check preventing Out of band access. There are tests trying to
access out of band handle like:
test_sink_invalid_ref and test_source_invalid_ref trying to access
handle 99.
Signed-off-by: Andrei Emeltchenko <andrei.emeltchenko@intel.com>
Use the maximum data PDU size time reservation space
considering the Data length could be updated from default
27 bytes to maximum support size.
If maximum time reservation is disabled then time space
reservation corresponding to the default data length at the
time of the start/enable of Central role is used.
Note, currently this value is only used to space multiple central
connections and not for actual ticker time reservations.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix connection parameter request procedure to be cacheable
if a remote control procedure is in progress.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix legacy control procedure implementation to avoid
connection update procedure with reason instant passed
(0x28).
Connection Update Indication PDU is enqueued after data
enqueue to LLL context is paused and the enqueue resumes
when already enqueued data PDUs are all acknowledged.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Since the event length update is not necessarily an improvement
in all situations a Kconfig option is added so that it can
be disabled for the users that do not need it.
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Fix the controller implementation to perform connection
event length reservation based on the completed Data Length
Update and/or PHY Update Procedure.
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Proper handling re. non-supported CIS TERMINATE
This fixes EBQ test LL/PAC/CEN/BV-01-C on the general level.
'Replaces' #ee2a43b5dcf884730130345c402d87b2bce9dba1
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Fixes#53786
The variable slot_plus_us is assumed to be a number in us unit.
To assign the maximum possible CTE length to this variable,
BT_HCI_LE_CTE_LEN_MAX has been used while this parameter is defined
in a 8us units (it's 0x14=20 that corresponds to 160us).
To convert this number to us, it's needed to be multiplied by 8.
Signed-off-by: Saleh Mehdikhani <saleh.mehdikhani@unikie.com>
Fixes two issues with the JIT scheduler:
Rescheduling of primary advertising packets for extended advertising
when using the JIT scheduler did not work, since the done events for
the primary events never made it into the reschedule logic
The EVENT_DONE_EXTRA_TYPE_ADV_AUX event (for auxillary packets) could
cause a "reschedule" for a primary event that was actually sent
successfully (causing it to be sent twice)
Signed-off-by: Troels Nilsson <trnn@demant.com>
The status field is currently a uint32_t even though there are only
3 possible values. Reducing it to a uint8_t allows status to fit in
existing padding in the struct, saving 4 bytes per ticker_user_op
Updated function signatures to match; ticker_op_func left as-is
to avoid having to update a whole bunch of files for no real benefit
Signed-off-by: Troels Nilsson <trnn@demant.com>
Fix MIC failure transmitting LL_CIS_REQ PDU.
The MAXPACKETSIZE value was not set with using Long Control
PDUs.
Relates to commit e895948047 ("Bluetooth: Controller: Add
Long Control PDU support").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Remove duplicate PPI/DPPI configuration in
radio_tmr_start_now() which reuses radio_tmr_start_us().
And other minor refactor to remove unnecessary conditional
compilation of a define.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix compilation error for ISO Broadcaster with dynamix Tx
power support, and remove setting tx power for ISO
Synchronized Receiver.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Updated implementation to save power consumption by
scheduling BIG event starting at the first BIS selected for
synchronization. Also, skip reception of any unselected
BISes in between multiple BISes that the Broadcaster is
transmitting. Added advance calculation of next subevent
channel index.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
From Bluetooth Core Specification v5.3 Vol 6 Part B Section
4.4.6.8 Channel indices,
The subevent number se_n shall be set to the values 1 to
NSE, in order, for the subevents on a given BIS - the same
values shall be used for all the BISes in a BIG - and to 1
for the control subevent.
Hence, fix implementation to reset back to se_n to 1 when
next BIS PDUs are transmitted in the subevents.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix broadcast ISO PDU receive connection handle. The look up
was using BIS index instead of the index of the selected
stream that is being received.
Example, when receiving BISes 2 and 4, only the connection
handle for BIS 2 was correct and connection handle lookup
was out-of-bounds for BIS 4; symptoms being that Host
dropped the received ISO PDU.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Budget for one extra ISO Rx PDU buffer for empty/NULL PDU
reception that has to always remain free in order to be able
to setup radio h/w for new PDU receptions.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix compile error building application with
BT_LL_SW_LLCP_LEGACY. Request Peer SCA command is not
supported in legacy control procedure implementation.
Relates to commit 76439d0ba4 ("Bluetooth: controller:
integrating SCA procedure and adding HCI API").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Introducing common pdu struct declarations for conn param req/rsp and
data length req/rsp to utilize identicality for optimal pdu handling
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
If a central or peripheral is not configured for ISO connected streams,
reject a remote LL_CIS_TERMINATE_IND procedure, responding with an
unsupported feature error (BT_HCI_ERR_UNSUPP_FEATURE).
This fixes EBQ test /LL/PAC/CEN/BV-01-C.
Signed-off-by: Morten Priess <mtpr@oticon.com>
For making handle available in vendor sink creation, add ISO handle
to function prototype.
Expose datapath allocation via new ull_iso_datapath_alloc function.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Function ll_setup_iso_path has a construction which causes proprietary
compiler to generate incorrect code. As a workaround, local data path
pointer variables are eliminated.
Signed-off-by: Morten Priess <mtpr@oticon.com>
For framed case, the internal RX SDU counter would increment regardless
of whether the first valid SDU was received or not. According to spec,
SDU counter synchronization is done from first valid SDU.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Make sure ll_iso_stream_connected_get returns NULL until CIS is
established. Always return DISALLOWED when trying to disconnect a CIS
which is not connected.
Signed-off-by: Morten Priess <mtpr@oticon.com>
When a CIS is terminated, the associated link pool must be de-
initialized to be ready for next creation of the corresponding
instance in memory.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Do not assert on invalid PDU in CIS create procedure. Instead terminate
with reason BT_HCI_ERR_LMP_PDU_NOT_ALLOWED
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Corrected an omission in the ISO-AL that required an SDU interval to
be added to the reconstructed RX time stamps for each SDU after the
first.
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
- New calculation of Max_PDU for framed case according to BT Core 5.4
- Fix CIS_Offset calculation for multiple CIS usecase
- Fix resume ticker setup for central
Signed-off-by: Morten Priess <mtpr@oticon.com>
An LE controller shall no longer support HCI_Read_Local_Supported_Codecs
[v1] according to BT Core 5.3.
Command bit and support code removed.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Adding a bit-mask to the 'extra' data structure allowing passing info
re. active CIS's to the ull_conn_iso_done handling. Per CIS storing
an expiration time counter, monitoring in done handling. Adding
establishment timeout monitor in CIS Create procedure, completing
and ntf'ing accordingly.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
If a CIS is in teardown state, the data in structure should not be
trusted, so skip passing data to ISOAL
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Instead of storing the calculated reload value (in conn intervals) in
the conn object, now store the timeout value, and perform calculation
when used. This allows using the timeout value across all CIS's without
having to re-calc and store on change of TO
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Missing decode of conn_event_count on CIS_IND
Peripheral Suggest update to conn_event_count in case of a delayed
CIS_IND, allowing CIS peripheral more time to setup
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Add mayfly locking around the access to the local pending procedure list
as it is accessed by both thread and mayfly.
Fixes#45427
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
When generating notification for Sleep clock accuracy, check for
success on rx_node allocation was left out. This is added.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
The `bluetooth/common/log.h` and `bluetooth/common/log.c` files have been
removed. Files that were using them have been updated to use
`zephyr/logging/log.h` instead.
Those replacement have been done consequently:
- `/BT_DBG/LOG_DBG/`
- `/BT_ERR/LOG_ERR/`
- `/BT_WARN/LOG_WRN/`
- `/BT_INFO/LOG_INF/`
- `/BT_HEXDUMP_DBG/LOG_HEXDUMP_DBG/`
- `/BT_DBG_OBJ_ID/LOG_DBG_OBJ_ID/`
Also, some files were relying on the `common/log.h` include to include
`zephyr/bluetooth/hci.h`, in those cases the include of `hci.h` has
been added.
For files that were including `common/log.h` but not using any logs,
the include has been removed and not replaced.
Signed-off-by: Théo Battrel <theo.battrel@nordicsemi.no>
Implement HCI commands HCI_Read_Connection_Accept_Timeout and
HCI_Write_Connection_Accept_Timeout, and enable the feature in
supported commands.
Remove hardcoded use of default accept timeout in new LLCP code, and
use configurable value instead.
This makes EBQ test /HCI/CIN/BV-03-C pass.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Adjust skip value so that there is minimum of 6 events that can be
listened to before Sync_Timeout occurs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Ensure maximum size of common extended header format be
reserved when CONFIG_BT_CTLR_ADV_RESERVE_MAX=n is used so
that changes to ACAD, like channel map update does not need
frequent update to periodic advertising auxiliary channel
PDU time reservations.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When calculating the offsets between primary advertising
PDU, auxiliary PDU, Periodic Advertising PDU, and BIS PDU,
the values used as anchor points for starting the periodic
interval for auxiliary, periodic and BIG events, should be
ensured to have the minimum auxiliary frame spacing T_MAFS
between the PDUs. EVENT_OVERHEAD_START_US has to be reduced
as this value is used to offset the start of the radio
event on air.
Reverts commit b867f0e8a6 ("Bluetooth: Controller: Fix
T_MAFS between broadcasting roles").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The default number of buffers (contexts) for locally initiated
procedures was 4. Per default the host initiates 3 procedures
when opening a connection, allowing the application to initiate
only 1 additional procedure in parallel.
This commit increases the default to 6, if auto phy-update and
dle is enabled, increasing the robustness for an application.
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
- Add CIS Create policy config choices
- Implemented CIS Central in ULL following proposed setup/commit flow
- Full support for HCI_LE_Set_CIG_Parameters_Test
- Extend ull_conn_iso_start and ull_conn_iso_ticker_cb to handle
central role
- Partial support for HCI_LE_Set_CIG_Parameters. TODOs:
* Drop suggested retransmissions if Max_Transmission_Latency is
exceeded
* Calculate ISO interval based on policy
Signed-off-by: Morten Priess <mtpr@oticon.com>
Fix issues with referencing invalid netbuf data and add missing
parameter. Removed returning of handle in setup functions, as handles
are not available until commit.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Move ull_peripheral_iso_start ull_peripheral_iso_ticker_cb to
ull_conn_iso, to share code between CIS peripheral and central.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Local procedure for CIS central establishment. Calls yet unimplemented
functions in ull_central. Changes are guarded by
CONFIG_BT_CTLR_CENTRAL_ISO.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Replace the BT_CTLR_ADVANCED_SCHEDULING_CENTRAL_CONN_SPACING
Kconfig with BT_CTLR_CENTRAL_SPACING to configure the
the spacing from the beginning of a central connection event
to beginning of the next central connection when supporting
multiple simulataneous central connections.
If the BT_CTLR_CENTRAL_SPACING in microseconds is smaller
then the required time reservation for a connection event,
for given maximum data length and PHY in use, then the
calculated time reservation will be used as the spacing
between consecution central connection events.
The change fixes an issue wherein use of old Kconfig with
higher values causes new central connections to be placed
in between already connected central role if there was
free time space available to fit the new connections time
reservation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Explicitly set all bits of used radio registers when
configuring radio events, removing the dependency on having
the power-on reset value and removing the need to ensuring
power-on reset values being set in the radio peripheral.
This will ensure the Controller has radio register value
correctly configured irrespective of changes across SoCs'
radio register power-on reset values.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix advertising set's is_enabled flag to be reset when
connection complete is dequeued for connectable advertising
started using legacy advertising enable HCI commands. And
reset the is_enabled flag when advertising set terminated
is dequeued for connectable advertising enabled using
Extended Advertising HCI commands.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ticks difference calculation to determine delayed
prepare callback. Without the use of masking by
ticker_ticks_diff_get, the diff value can be higher than
the supported 24-bit value. i.e. ticker_ticks_now_get()
rolls over in 24-bit value, whereas ticks_at_event is
free running value of 32-bits.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add long control PDU size support, also the implementation
now allocates control PDU size restricted to the supported
biggest control PDU that is enabled in the application
build. Features that are covered based on the increasing
control PDU sizes are ClearText connections, Encrypted
Connections, Connection Parameter Request support and
Create CIS control Procedure (Connected Central ISO)
support.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
-- Handle time calculations across the point at which the controller's
time information from the controller's clock will wrap (in the
microsecond range)
-- Use wrapped time in all ISO-AL time calculations
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Adding support for allowing user extension code to support deferring
anchor point moves. Refactored LLCP only.
Note: This is NOT supported by LEGACY LLCP impl.
KConfig'd by BT_CTLR_USER_CPR_ANCHOR_POINT_MOVE
Modified ll_conn_update API, to accommodate passing offsets
Modified CPR/CU context data structure
Modified CPR/CU procedure to handle anchor point move wait state
Fixed up unit tests, adding anchor point move cases to CPR/CU test
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Using a macro instead of repeated identical code for validation
Use macro for pdu length field encoding
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Adding controller support for updating SCA in ACL and ISO peripherals
Adding HCI API support for le_request_peer_sca and complete event.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Check LE event mask state as well as host controlled feature mask state
and reject CIS request accordingly.
Release pre-allocated ISO resources on rejection of request
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Program CIG ticker with window widening drift. Introduce vendor specific
conversion macros allowing sub-microsecond resolution in the
accumulation of window widening drift per interval.
Calculation of window_widening_max_us is done for NSE<3, and must be
adjusted in the LLL before use, if the first CIS in the CIG has a
NSE>=3. In that case window_widening_max_us shall be limited to one sub
interval.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Functions related to string manipulation that were defined in
`common/log.h` has been moved to the `common/bt_str.h` file and their
implementation in `common/bt_str.c`.
Files that were using those functions has been updated consequently.
Signed-off-by: Théo Battrel <theo.battrel@nordicsemi.no>
Fix ticker slot reserved check to handle deferred execution
of ticker worker where ticks_elapsed is greater than
ticks_slot_previous. In which case, each ticker expiring be
checked for overlap with previous slot reservation.
This fixes:
ASSERTION FAIL [0] @ WEST_TOPDIR/zephyr/subsys/bluetooth/
controller/ll_sw/nordic/lll/lll.c:476
lll_preempt_calc: Actual EVENT_OVERHEAD_START_US = 3906
Flash erase operation exposed the assertion, CPU being
halted deferred the ticker_worker collision resolution and
ticker expiry was not individually checked for overlap with
previous expired ticker reservation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing first connection event due to first connection
event ticks_slot of central and peripheral overlapping with
the initiator window ticks_slot and advertising ticks_slot,
respectively.
Use ticker_stop_abs interface so that when the ticker is
stopped the ticks_slot_previous is truncated to the actual
ticks used as requested by the supplied absolute ticks.
Relates to commit 8a294a62d4 ("Bluetooth: controller:
legacy: Fix missing first conn event").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ticker instance ticks_current initialization to be
acquired from the RTC counter value. The RTC counter may
have run in previous use of ticker before bt_disable hence
keep the instance ticks_current equal to RTC counter value
when ticker_init() is called again.
Relates to commit 4349a475a8 ("Bluetooth: Controller: Add
deinit() infrastructure").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
In order to avoid using multiple sources of truth for the platfom's
endianness, convert the in-tree code to use the (BIG|LITTLE)_ENDIAN
Kconfig variables exclusively, instead of the compiler's
__BYTE_ORDER__.
Signed-off-by: Carles Cufi <carles.cufi@nordicsemi.no>
According to specification, when executing a remote procedure the
rx parameters used need to be updated when the REQ from the peer
is received. Currently this is done only when an ACK is
received on the RSP PDU send out.
This commit updates the RX parameters upon receipt of the REQ PDU
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Macro that was defined in the `common/log.h` has been moved to the newly
created `common/assert.h` file.
Files that were using those macro has been updated consequently. Also, the
include of `common/log.h` has been removed of files that were actually not
using any logging methods.
Some `#include "common/log.h"` have been removed. Those were required
before when including `hal/debug.h`. With this change, `hal/debug.h` no
longer has this requirement, because the replacement, `common/assert.h`
includes what it uses.
Signed-off-by: Théo Battrel <theo.battrel@nordicsemi.no>
Change automated searching for files using "IRQ_CONNECT()" API not
including <zephyr/irq.h>.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Adds proper support for having more than one PDU pool for the advertising
PDUs (to save memory)
- Introduces lll_adv_aux_data_init, lll_adv_aux_scan_rsp_alloc and
lll_adv_sync_data_init to indicate if the PDU is a primary/legacy PDU
or secondary/auxillary PDU
- Scan response PDUs are initialized later, since the correct pool to draw
from depends on whether the advertising is extended or legacy
Signed-off-by: Troels Nilsson <trnn@demant.com>
There is access to the procedure context after a potential release
of the context, which (in theory) can lead to incorrect behaviour
There is no good way of testing this with a unittest without adding
specal debug code to the ull_llcp_local module
After code-inspection no other location has been found with
potential access after context release
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
According to Core 5.3 Vol 4, Part E, section 7.8.82 slot_durations,
switch_pattern_len and ant_ids are used only for AoA and do not affect
reception of AoD CTE.
To improve interoperability checking of correctness of these parameters
is not required. It will not affect lower link layer in case the AoA
CTE reception feature is not enabled in Kconfig.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The sys* ops like sys_clear_bit are indirectly included via arch CPU
header. Other stuff like find_msb_set end up included via this header as
well.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
- Account for the added random delay when updating remaining duration
- Re-worked JIT re-scheduling update a bit to keep the random delay
information and remaining duration correct
Signed-off-by: Troels Nilsson <trnn@demant.com>
- Remaining duration is now in us instead of ticks to avoid
overflow when ticks have higher resolution
- First advertising event should not reduce remain duration
Signed-off-by: Troels Nilsson <trnn@demant.com>
Add EVENT_OVERHEAD_START_US to ticks_anchor when enabling
advertising, so the first advertising event is not late due
to calculations for aux packets etc.
Signed-off-by: Troels Nilsson <trnn@demant.com>
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Tune the EVENT_OVERHEAD_START_US for typical usecases on
nRF52833 SoC using the central_gatt_write and
peripheral_gatt_write samples.
Manually run the samples for over 30 mins without any
assertions and use the actual profiled value that would
otherwise be printed on assertion.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When ticks_to_expire is in the past, i.e. ticks_to_expire is
0, perform an explicit trigger of ticker worker instead of
setting up the compare which delays the trigger by the
minimum ticks offset margin. The changes reduce latencies
of the O(n) ticker_resolve_collision by upto the minimum
ticks offset margin (3 for nRF SoCs) for each resolution.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When an event's prepare is delayed due to ULL scheduling or
ISR latencies, check and have a verbose assertion that logs
the actual EVENT_OVERHEAD_START_US required.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Conditional compile ticker interfaces like ticker_update
which are not required when individual state or role samples
are build.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix the BIG event counter calculation from stored payload
counter. Event latency should not be multiplied by burst
count.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing includes and rearrange header includes to be able
to build a full feature set Controller.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Set the correct number of Ctrl Tx buffers used for the new
implementation, so that the ACK-fifo gets the correct size
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Conditionally compile the legacy control procedure defined
control Tx buffers that is not required in the new control
procedure implementation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Adds support for handling fragmented advertising data over HCI when
CONFIG_BT_CTLR_ADV_AUX_PDU_LINK is not enabled
- Added support for appending advertising data to ull_adv_aux_hdr_set_clear
and ull_adv_aux_pdu_set_clear via ULL_ADV_PDU_HDR_FIELD_AD_DATA_APPEND
- Updated ll_adv_aux_ad_data_set and ll_adv_aux_sr_data_set to
handle fragmentation ops without CONFIG_BT_CTLR_ADV_AUX_PDU_LINK
Signed-off-by: Troels Nilsson <trnn@demant.com>
Remove redundant assertion check, and minor indentation fix
to correct the alignment of function call.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Enable ticker ticks slow window extensions implementation
when broadcaster role is enabled. This feature moves the
primary channel advertising event within the specified
window when overlapping with other roles.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Implemented:
-- Combining segments from multiple SDUs in a single PDU for TX
-- Release of PDU based on remaining capacity below threshold
-- Release of any PDUs in production on receiving a timeout for the
upcoming event
-- Release of PDUs in production if source if destroyed
-- Synchronization flag to exclude multiple contexts in ISO-AL
-- New Kconfig BT_CTLR_ISO_TX_SEG_PLAYLOAD_MIN to allow definition of
minimum TX segment size
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Implements:
-- SDU fragments can be buffered in the ISO-AL so that the correct size
of the SDU can be computed such that it can be released for inclusion
in the first fragment's header
-- Changed SDU emit interface to allow the same structure to be used to
buffer as well as release fragments
-- New configuration BT_CTLR_ISO_RX_SDU_BUFFERS to specify the number of
SDU buffers for each sink
(Buffering disabled when BT_CTLR_ISO_RX_SDU_BUFFERS=0)
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Implemented:
-- Storing information required to service HCI_LE_Read_ISO_TX_Sync
request
-- Implemented interface to retrieve information
-- Cleared ISO-AL source and sink state on deallocation
-- Renamed cig_ref_point to grp_ref_point as it serves a common purpose
in both CIS and BIS
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Improvement for IAL/CIS/FRA/PER/BI-01-C & IAL/CIS/FRA/PER/BI-02-C
-- Test appears to fail as the transmitted PDU is packed with less data
than is indicated in the segment headers.
-- Guards were included to verify that sufficient data exists in the PDU
before extracting the segment.
General
-- Updated timestamps in error SDUs to better approximate the expected
timestamps if time information is missing.
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
In case a connection update complete event reports an error, the
parameters reported should be the ones active on the connection and not
the ones requested
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
LE Write Suggested Default Data Length and LE Set Data Length commands
are suggestions from host and should be validated only as per HCI
specification regarding internal setting of LLCP.
LLCP is allowed to use other values if needed.
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
The memory used for Tx buffers and procedure context must
be aligned on a word boundary, otherwise it is possible
to get unaligned memory access
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Fix radio_tmr_start_us to be soft realtime, if the requested
start in microseconds is in the past, setup the next
earliest expiry. This is to prevent radio not being started
and not let the LLL hanging. When setup to receive auxiliary
PDU in LLL scheduling, is_aux_sched is set and if radio does
not start and the window is requested to be pre-empted, then
it is blocked from being preempted due to the is_aux_sched
flag remaining to be set. This stalls the scanning
infinitely until explicit scan disable.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing is_aux_sched flag being reset before resuming to
scan for new advertising PDU in the same scan window after
having received an earlier primary channel PDU and auxiliary
channel PDU using LLL scheduling.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix receiving spurious overlapping ADV_IND and SCAN_IND PDU
when LLL state expects to receive SCAN_RSP PDU. Explicitly
check that these PDUs are not processed when in active
scanning and waiting for SCAN_RSP PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
If scan is being disabled, rx could already be enqueued
before coming to ull_scan_aux_rx_flush. Check if node rx is
not the last in the list of received PDUs then add it to the
list, else do not add it to the list to avoid duplicate
report generation, release and probable infinite loop
processing of the list. It is possible that node rx has not
be already added in case of last PDU in the chain, under
this case when scan is being stopped add it to the list
before auxiliary context is flushed.
Add the node rx to aux context list of node rx if not
already added when coming to ull_scan_aux_rx_flush. This is
handling a race condition wherein the last PDU in chain is
received and at the same time scan is being disabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix scan aux context leak on Periodic Sync Terminate. On
Periodic Sync Terminate the `is_stop` flag is set to prevent
the ULL from assigning an aux context to the sync context,
but the acquired aux context was neither assigned to sync
context nor was being released back to the aux context pool.
Fixed by releasing the aux context if not assigned to the
sync context when `is_stop` flag is set.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
With introduction of refactored LLCP was also introduced an error
re. calculation of initial slot reservation in connection setups.
Due to this error a bigger slot was reserved, leading to failure due to
connection overlaps in multiple.sh test.
Also the removal of this 'overhead' in slot reservations calls for
bigger time-allowance for l2pcap_stress test.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Fix implementation to not reset the ticks_slot_id_previous
when ticker yields its reserved slot, only reset if ticker
was stopped.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ticker worker from checking the ticks_slot_id_previous,
only ticks_slot_previous be checked as previous slot id
would be assigned to TICKER_NULL if the ticker was stopped.
The ticks_slot_previous value should be used to check that
a slot is reserved even if the ticker has been stopped.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add in Kconfig, select DEPRECATED, to warn at build time
that the LLCP legacy implementation is deprecated and the
refactored LLCP enabled by BT_LL_SW_LLCP Kconfig option be
used instead (which is the default now).
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix BIS max PDU size used in calc of sub_interval, use the
minimum of supported maximum BIS PDU size and the requested
SDU size. This will avoid wasted air time between subevents
when SDU size is less than maximum supported PDU size, where
only 150 us tIFS is mandatory between subevents.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When calculating the offsets between primary advertising
PDU, auxiliary PDU, Periodic Advertising PDU, and BIS PDU,
the values used as anchor points for starting the periodic
interval for auxiliary, periodic and BIG events, should be
ensured to have the minimum auxiliary frame spacing T_MAFS
between the PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use a local variable to assert check on auxiliary context's
release.
Add missing volatile qualifier to the parent field of the
auxiliary scan context.
Under race condition a released aux context can be allocated
for reception of chain PDU of a periodic sync role, hence
fix the assertion check to consider that the released
context can be allocated to other roles.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Increase the BIS PDU access address receive timeout, use the
+/- 2 us jitter for each subevent.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix inifinite loop in ll_rx_get() when both ISO Broadcast
and ISO Receive features are enabled in a build. Missing
conditional compile prevented the ack_last index that
maintains a relation between number of packets complete and
the received data packets was unassigned.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
According to Bluetooth 5.3 Vol 4, Part E section 7.7.65.21 the
Controller should send an IQ report with Packet_Status set to 0xFF
and Sample_Count to 0x0, to inform Host that it is not able to
store IQ samples for all received Constant Tone Extensions and has
failed to sample at least once.
This commit adds handling of such situation for direction finding
in connectionless mode in lower link layer. It includes:
- lack of node_rx_iq_report to store IQ samples,
- lack of free node_rx to report received advertising data (generates
an advertising data report with indication "incomplete, no more to
come" and cancels reception of chained PDUs,
- cancellation of chained PDUs reception due to other scheduling
reasons.
In all of these situations CTE reception must be enabled and number of
received CTEs is smaller than requested by Host.
If there is not sufficient number of node_rx_iq_report nodes and
report was generated, the CTE will not be samples in a given
periodic advertising synchronization event. The CTE will be
sampled again in next event if there are node_rx_iq_report available.
End user applications may check periodic advertising sync event
counter when use of the reports to be sure about sync event
the received report is connected with.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix incorrect use of stream handle instead of connection
handle to enqueue Tx ISO Data, and use stream index to get
stream instance.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Enforce next_is_older only when current has equal force as
with the next ticker.
Added Kconfig to disable priority feature in ticker that is
currently not used by Zephyr Bluetooth Low Energy
Controller.
The priority feature if enabled then a custom ULL is needed
by vendors to avoid repeated skipping of overlapping events
as next_has_priority check uses lazy value that would be
always lazy_next > lazy_current as currently skipped event
becomes the next event with lazy value incremented by 1.
Regression in commit 3a9173afe1 ("bluetooth: controller:
Revised ticker for improved conflict resolution") due to
Zephyr Controller does not implement any vendor specific
priority logic.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Reduce the number of times cntr_cnt_get() is called in
ticker implementation as call to this function halts the
CPU inorder to access the RTC count in the 32KHz clock
domain.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Extended Scanning assertion check when using Ticker
Low Latency Implementation where the failure to schedule
a ticker timeout is returned inline compared to deferred
failure in the operation callback.
Auxiliary PDU is received using a single-shot ticker
timeout with ticks_slot reservation. This single-shot
ticker is allowed to fail if it is overlapping another
event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The LE Accept/Reject CIS Request commands shall return Unknown
Connection Identifier if the handle is not a CIS handle or does not
exist. If the CIS already has been established, the commands shall
return Command Disallowed.
Signed-off-by: Wolfgang Puffitsch <wopu@demant.com>
Fix incorrect data type int32_t local variable used for lazy
value which is uint16_t type.
Other minor code refactor done.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing conditional compile of structure members not
required with BT_TICKER_SLOT_AGNOSTIC is enabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add 'U' to a value when assigning it to an unsigned
variable.
MISRA-C rule 7.2
Relates to commit b97db52de7 ("misra-c: Add 'U' to
unsigned variable assignments in subsys/").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix incorrect use of stream index (application selected list
of BIS stream) instead of BIS index when checking for
whether the received PDU is to be stored and to be
dispatched as ISO data to ULL.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing Broadcast ISO Synchronized Receiver terminate
reason initialization that caused Sync Lost immediately on
a new Sync Establishment due to previous Sync terminate
reason not being reset.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing implementation to correctly to use data channel
index for subevents when previous subevent of previous BIS
stream where skipped.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ISO broadcast implementation to flush stale ISO data for
all BIS streams and like wise generate acknowledgements for
all BIS streams that had its ISO data transmitted at its
reference anchor points.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Restrict the calculated possible Pre-Transmission subevents
count to a maximum of 1 so that the full ISO interval is
not fully occupied by the BIG event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix a leak in generation of Number of Completed Packets when
more than one handle has acknowledgements to be processed.
The loop exited for the current handle by dequeueing the
node tx element of the next handle leading to lost Number of
Completed Packets.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When radio event prepare is cancelled due to preemption by
overlapping radio events, the extra done event processing
was missing and hence the use of accumulated prepares'
skip/latency count.
This caused the check for supervision timeout and sync
lost not be aware of the elapsed events.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add 'U' to a value when assigning it to an unsigned
variable.
MISRA-C rule 7.2
Relates to commit b97db52de7 ("misra-c: Add 'U' to
unsigned variable assignments in subsys/").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add the missing ticker resolution margin when calculating
the ticks_anchor to be used to get non-overlapping BIG
events.
Relates to commit fab4511164 ("Bluetooth: Controller: Fix
overlapping advertising events").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
For the encryption procedure exists a flag used to indicate that the
procedure expects all PDUs to be delivered to the procedure STM.
This flag was not cleared during creation of new procedure. This could
lead to unexpected PDUs being passed to local procedure STM
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Fix compile error when BT_CTLR_JIT_SCHEDULING is enabled but
BT_CTLR_ADV_EXT is disabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When periodic advertising with chaining is re-enabled after
changing interval or just re-enabled then the chain PDUs
where not duplicated causing the LLL to assert detecting the
presence of aux pointer but no linked chain PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor to revert back the terminate check condition to
check the connection role first.
Reverts legacy code changed in
commit 8b1d50b981 ("Bluetooth: controller: llcp: fix issue
re. missing ack of terminate ind").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Do not use lazy value to prioritize ticker with ticks slot
window that yield to other tickers. Primary channel PDUs
use ticks slow window to nudge themself after an
overlapping ticker within the ticks slot window, but such
ticker may be skipped to next interval. At the next
interval if they again overlap with other tickers then
lazy value shall not be used to prioritize but rather
continue to yield again. This is required to avoid BIG
events from being skipped.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix BIG Create implementation from silently failing on
values of RTN and SDU_interval that lead to BIG events that
cannot be acheived when using sequential or interleaved
subevents by the Controller Implementation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add a Kconfig for Advertising Data Chaining in Extended and
Periodic Advertising, permitting AD data lengths of upto
1650 bytes. The implementation is experimental and needs
further testing.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix BT_CTLR_ADV_DATA_LEN_MAX and other Kconfig dependencies,
and clean up the use of PDU_AC_LL_SIZE_MAX which is used to
allocate scratch packet to be atleast able to accommodate
the minimum 31 bytes AD data such that it is sufficient to
transmit and/or receive scan response PDUs when either
broadcaster or observer alone is supported.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Allow requesting any TX power in SDC via kconfig. This enables easily
setting higher TX values when using a FEM.
Signed-off-by: Timothy Keys <timothy.keys@nordicsemi.no>
- Fix ISO TX data pool corruption due to multiple calls to
tx_cmplt_get, without removing the nodes
- Added missing release of TX node link in case of ISOAL error
Signed-off-by: Morten Priess <mtpr@oticon.com>
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix ISO Tx PDU memory pool corruption due to duplicate ISO
Tx PDU buffers repeatedly released into the memory pool.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Move the removal of BIG context association with the
Periodic Advertising context to when the BIG streams are
release and BIG terminate message is generated.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Added implementation to use the BIS array parameter and
selectively synchronize to subset of multiple Broadcast
Isochronous Streams in a Broadcast Isochronous Group.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix calculation of BIS subevents that was missing num_bis
when calculating the PDU latency.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix incorrect conditional compile to disable Controller
advanced scheduling feature which is required for Broadcast
ISO implementation.
Regression in commit 6fe1299c33 ("Bluetooth: controller:
llcp: fix CI tests for new LLCP").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
In a Host plus Controller combined build for ISO feature
restrict the maximum ISO Tx PDU size to minimum of 251 bytes
and Host ISO Tx MTU. This will allow controller to use
reduced Tx time (subevent interval).
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
As of today <zephyr/zephyr.h> is 100% equivalent to <zephyr/kernel.h>.
This patch proposes to then include <zephyr/kernel.h> instead of
<zephyr/zephyr.h> since it is more clear that you are including the
Kernel APIs and (probably) nothing else. <zephyr/zephyr.h> sounds like a
catch-all header that may be confusing. Most applications need to
include a bunch of other things to compile, e.g. driver headers or
subsystem headers like BT, logging, etc.
The idea of a catch-all header in Zephyr is probably not feasible
anyway. Reason is that Zephyr is not a library, like it could be for
example `libpython`. Zephyr provides many utilities nowadays: a kernel,
drivers, subsystems, etc and things will likely grow. A catch-all header
would be massive, difficult to keep up-to-date. It is also likely that
an application will only build a small subset. Note that subsystem-level
headers may use a catch-all approach to make things easier, though.
NOTE: This patch is **NOT** removing the header, just removing its usage
in-tree. I'd advocate for its deprecation (add a #warning on it), but I
understand many people will have concerns.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Fix prepare pipeline preempt timeout stop from stopping a
a prevously started timeout for the next in pipeline event.
The preempt timeout started prior for the current event that
has its prepare that is invoked is to be not explicitly
stopped. If there is a next prepare event in pipeline, then
the prior preempt timeout if started will be stopped before
starting the new preempt timeout. Refer to implementation in
preempt_ticker_start().
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation in Periodic Sync LLL abort to use near
fair scheduling to ensure overlapping multiple Periodic
Sync set each get to use the radio and not lead to Sync
Loss.
The implementation is used when overlap in radio event
happens in unreserved time space of the event. An abort
count is maintain in each Periodic Sync instance and is
used to decide whether the current event or the next
event is to be aborted when they overlap.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add Kconfig to use minimal time reservation for auxiliary
and sync PDU reception. A peer device could be scheduling
multiple advertising sets in a short duration with small
PDUs hence using the minimal time reservation would avoid
skipping closely scheduled reception of multiple auxiliary
PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
This commit replaces API that became deprecated with the release
of nrfx2.9 - see CHANGELOG in zephyrproject-rtos:hal_nordic repository
Signed-off-by: Adam Wojasinski <adam.wojasinski@nordicsemi.no>
When AUX_ADV_IND or AUX_CHAIN_IND auxiliary channel PDU scan
radio event overlaps Periodic Sync radio event in unreserved
time space, let the Periodic Sync radio event be aborted so
that the auxiliary channel PDU can be received to generate
Extended Advertising Reports. Added a new Kconfig to enable
this.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Re. peripheral phy update procedure: UNKNOWN_RSP from central was not
handled, leading to stall of procedure and subsequent procedure timeout
Proper handle and unit test for case added.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Fix regression in overlapping 1M and Coded PHY scan window
by considering rounding margins when checking for same
interval and same window durations.
Relates to commit c14bde45b6 ("Bluetooth: Controller: Fix
overlapping 1M and Coded PHY scannning").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When AD data length of greater than 191 bytes support is
enabled then default to using the back-to-back PDU chaining
feature in the Controller.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Extended Advertising and Periodic Advertising's parent
PDU's aux ptr field to contain correct aux offset value to
its chain PDU.
Uninitialized pointer reference to aux ptr in the parent PDU
was used before the pointer reference was returned by the
function adding the aux ptr fields in the parent PDU.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use local variable to update current PDU's Common Extended
Header Format flags instead of updating it directly in the
PDU buffer. This is required to be able to non-destructively
be able to manipulate the PDU's header flags and contents
many time before a final commit of the updated PDU.
In order to calculate overflowed AD data length, PDU is
manipulated couple of times to determine the overflow length
and next to be able to add aux ptr field when chain PDU is
appended.
The changes are now consistent with how Periodic Advertising
PDU's Common Extended Header Format is manipulated.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix regression in adding ADI in scan response PDU introduced
in implementation adding support for AD data fragment
operation.
Setting scan response data with ADI failed with too long
data error. This was caused by a bug in calculating the
offset to the overflow length returned back by the call
to set_clear function.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
In case Controller reports to Host insufficient resources to store IQ
samples, according to BT 5.3 Core spec. Vol 4, Part E, sections
7.7.65.21 and 7.7.65.22:
1) packet_status shall be set to BT_HCI_LE_CTE_INSUFFICIENT_RESOURCES
2) sample_count shall be set to zero.
That means there should be no IQ samples stored in IQ report.
HCI implementation stored single IQ sample with value BT_HCI_LE_CTE-
_REPORT_NO_VALID_SAMPLE.
The commit fixes that. No additional memory is added to event buffer
and no IQ sample is stored if sample_count is zero.
Also there is added code that handles situation where ULL provides
IQ report with packet_status indicating valid IQ samples report
but sample_count is zero. In such case Host event stores single IQ
sample with value BT_HCI_LE_CTE_REPORT_NO_VALID_SAMPLE.
In case of vendor specific counter part of the event the value is
BT_HCI_VS_LE_CTE_REPORT_NO_VALID_SAMPLE.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Add vendor specific IQ samples report that holds IQ data in 16 bits
signed integer format. Thanks to that we preserve complete accuracy of
IQ samples provided by Nordic Direction Finding Extension in Radio
peripheral. That helps to maintain better accuracy of evaluated
angles with use of reported IQ samples.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
It is frequent to find variable definitions like this:
```c
static const struct device *dev = DEVICE_DT_GET(...)
```
That is, module level variables that are statically initialized with a
device reference. Such value is, in most cases, never changed meaning
the variable can also be declared as const (immutable). This patch
constifies all such cases.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Setting the new LLCP as default exposed errors in CI tests, which
are fixed here
Note that advanced scheduling needs to be disabled. Work is in
progress for implementing this for the new LLCP
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
The prpa cache is now exposed through the ull_filter_lll_prpa_cache_get()
function (as the resolve list already is). This is needed to be
able to reply to AUX_CONNECT_REQ within the required time when
using SW-based RPA resolving
Signed-off-by: Troels Nilsson <trnn@demant.com>
Direction finding functionality does antenna switching during CTE
reception in AoA mode and CTE transmission in AoD mode. Antennas are
switched according to user provided antenna switch pattern. If a CTE
length is enough to exhaust all antenna ids in a switch pattern then
Radio should loopback to reference antenna and continue from switching
from it.
Current implementation loops back to wrong antenna due to wrong index
used in GUARD_REF_ANTENNA_PATTERN_IDX. It was set to one instead of
zero. Zero is the index of reference antenna in Host provided antenna
switching pattern array.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Added define PDU_AC_EXT_AD_DATA_LEN_MAX, maximum AD data
length possible in AUX_ADV_IND when all Common Extended
Header Format fields are populuted.
Updated function description to explain the added ADI and
Aux Ptr fields support in updating the auxiliary PDUs.
Remove the redundant CTE info population code unnecessary
for new chain PDU as a result of AD data overflow.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use minimal time reservation for auxiliary and sync PDU
reception. A peer device could be scheduling multiple
advertising sets in a short duration with small PDUs hence
using the minimal time reservation would avoid skipping
closely scheduled reception of multiple auxiliary PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor DF implementation to add aux offset in the aux
pointer field of the parent PDU when chain PDU is added
and/or is duplicated when PDU contents are updated.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation to support Extended Scan Response Data
fragment operation of first, intermediate, last, unchanged
and complete data operation using the HCI LE Set Extended
Scan Response Data Command.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Minor refactor of scan response implementation to rename sr_pdu
to sr_pdu_prev, and aux_pdu to sec_pdu_prev etc.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation to support Extended Advertising AD Data
fragment operation of first, intermediate, last, unchanged
and complete AD data operation using the HCI LE Set Extended
Advertising Data Command.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Rename Kconfig BT_CTLR_ADV_PDU_BACK2BACK to
BT_CTLR_ADV_AUX_PDU_BACK2BACK to represent use of
back-to-back for Extended Advertising PDU chaining support
similar to BT_CTLR_ADV_SYNC_PDU_BACK2BACK that is used to
represent the use of back-to-back for Periodic Advertising
PDU chaining support.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Update ull_adv_sync_pdu_set_clear() to return aux_ptr
reference so that aux_ptr field for chain PDUs can be
pupulated.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor PDU chaining implementation to add aux offset in
the aux pointer field in the parent PDU when duplicating
chain PDUs.
By adding the aux offsets in the ULL execution context the
LLL prepare execution in Extended and Periodic Advertising
does not need to have a O(n) while loop in LLL execution
context.
This will reduce CPU use in the highest priority ISR
compared to current implementation where chain PDUs where
duplicated in ULL execution context and aux offset populated
in LLL execution context.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Cleanup Periodic Advertising Chain PDUs auxiliary pointer
population, populate the back to back auxiliary pointer
field in thread context. Also, removed an unused code for
filling data.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Refactor the ull_adv_aux_hdr_set_clear function so that the
caller of the function will enqueue the auxiliary PDU when
enqueuing the primary PDU.
This change is required to support chaining of AD Data where
parent auxiliary PDU will be added with aux ptr fields when
chain PDUs are appended.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Periodic Advertising Synchronization from being
preempted by an overlapping Auxiliary PDU scan event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix skipped Periodic Advertising Sync radio events due to
increased CPU use during pre-emption in LLL from a Scan
radio event to Periodic Advertising Sync radio event by
increasing EVENT_OVERHEAD_START_US value.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix to prevent a transmitted CONNECT_REQ PDU from being
aborted mid-air when initiator is using continuous scan
window that do not use time reservation. A different state
or role that overlaps the connection initiation requesting
for an abort should be denied when CONNECT_REQ PDU has been
enqueued for tranmission by the radio.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When directed advertising and continuous scanning are
simultaneously active, and a connection request is received
by the directed advertising state then the connection was
not established due to the done event not being generated.
Done event from the directed advertising state was not
generated because the prepare pipeline only had resume
event which does not get scheduled when there is prepare
event of the continuous scan state.
The fix is to explicitly abort all pending prepare and
resume event in the pipeline for the directed advertising
state when connection request is received.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Nordic Radio Direction Finding Extension provides 12 bits wide IQ
samples. The Bluetooth Core Specification 5.3 Vol 4, Part E sections
7.7.65.21 and 7.7.65.22 limits IQ samples to be 8 bits wide.
There are other way to convert 12 bits IQ samples into Bluetooth Core
specification compliant 8 bits IQ samples than ordinary 4 bits right
shift. If one is sure that samples will never go over 10 bits or 8
bits then, it is allowed to use 2 bits right shift or even 8 least
significant bits of 12 bits IQ samples.
The commit introduces a possibility to choose which approach is used
for IQ samples conversion in HCI layer while Host IQ report events
are created.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Provide common helper functions to create extended extended Zephyr
Fatal Error functionality in HCI common code.
Use the implementation in hci_rpmsg sample.
The sample didn't provide an information about Controllers assert
or system fatal error to an application code while run with nRF5340
SoC. The goal for hci_rpmsg sample change is to enhance user experience
for conformance testing of the Bluetooth Controller while executed with
nRF5340.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Review rework of the fix to remove the jitter in aux offset
and sync offset values.
Force select BT_TICKER_REMAINDER_GET and BT_TICKER_LAZY_GET
features when Extended Advertising and Periodic Advertising
is supported.
Rename ticks and microsecond offset value struct members
for primary PDU event offset (to auxiliary PDU event).
Converted HAL_TICKER_REMOVE_JITTER and HAL_TICKER_ADD_JITTER
macro to functions.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use remainder value in scheduling the periodic auxiliary
PDUs and use the ticker next slot get interface with
remainder value to fill the auxiliary offsets with
microsecond precision in the primary channel PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Updated ticker implementation to return remainder value for
a ticker when enumerating active tickers with time
reservations.
This is required to find offsets and to use the remainder
value to correctly calculate auxiliary offsets to the
microsecond resolution.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix overlapping 1M and Coded PHY scanning that caused idle
radio time when both PHY use same scan interval and sum of
their scan window duration equals the interval.
Implementation now will use continuous scanning and offset
the start of Coded PHY by the window duration of the 1M
scanning.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The initialisation of DLE parameters for the peripheral
was done before the intialisation of the PHY settings.
Since the DLE parameters depend on PHY settings this
can result in incorrect parameters for tx/rx time and
octets
One scenario is where a previous connection set the PHY to
2M or CODED, then when a new connection is established
it uses the same memory-locations for connection settings as the
previous connection, and the (uninitialised) PHY settings will be
set to 2M or CODED, and thus the DLE parameters will be wrong
This PR moves the initialisation of DLE parameters after
that of PHY settings
EBQ tests effected include LL/CON/PER/BV-77-C.
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
The mandatory minimum PDU length conformance test was failing
because the LLCP did update the effective rx/tx times (and
corresponding notification to host).
This was due to a missing test condition.
This PR adds the missing conditions.
Note that with this change the refactored controller code is
similar to the legacy code; relevant code is in ull_conn.c,
in the function event_phy_upd_ind_prep
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Fix redundant node rx reservation when receiving Periodic
Advertising Sync chain PDUs. Only the reception of first
pdu in chain, AUX_SYNC_IND PDU, needs extra node rx
reservation to be allocated for generation of incomplete
data status in case of incomplete reception of chain PDUs.
Co-authored-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix hang on chain PDU allocation by replacing K_FOREVER use
by a timeout. Hang occurs when configured number of
advertising data buffers is low.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
PHY update control procedure has to send a notification towards
Host when the PHY is actually changed, when the instant happens.
Control procedures are handled in a prepare phase of a connection
event, hence notifications are send towards host to early.
The fix for that is to postpone send of a notification.
New state has been introduced to remote requested PHY update
control procedure: RP_PU_STATE_WAIT_INSTANT_ON_AIR.
Also new event has been introduced: RP_PU_EVT_NTF, that is used
to inform the PHY update state machine that notification may
be send.
There are two places where the notification events may be generated
ull_conn_rx, just before first received PDU is send towards Host
or ull_conn_done, in case there were no PDU received.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Any project with Kconfig option CONFIG_LEGACY_INCLUDE_PATH set to n
couldn't be built because some files were missing zephyr/ prefix in
includes
Re-run the migrate_includes.py script to fix all legacy include paths
Signed-off-by: Tomislav Milkovic <milkovic@byte-lab.com>
Mayfly by design uses a memq for storage of its jobs. The memq
requires head and tail to track the content. It is considered
empty is head equals tail.
When memq instance is initialized then there is a new link
instance stored in head and tail, nevertheless the memq is
still empty.
When new job is enqueued to a memq, the inilial link is used
to store the job. New link, provided by enqueue call, is stored
in the tail for future enqueue.
When enqueued job was served and is dequeued, the link it was
assigned to is returned and stored in the job object.
That link will be used in future for call to enqueue.
Now lets consider a situation when we are just after initalization.
Some default initial link is in empty memq. We enqueue and dequeue
a job. After dequeue, the job object stores the initial link object.
The one that was put into the memq during initialization.
Next Bluetooth stack is disabled and enabled again.
The job is enqueued again, but it still stores the initial link
address. After enqueue the memq head points to initial link object,
that stores new job. Tail points to link deliveded by enqueue call,
that is also the initial link object. The memq is considered to be
empty, nevertheless there was a successful enqueue operation.
The issue is casued by lack of re-initialization of a job object
on init. In most cases these objects are static members of some
functions, hence there is no re-initialization after bt_disable
and bt_enable calls.
The problem is fixed by re-initialization of mayfly only once
on bt_enable() call. Then it doesn't matter what links are stored
in dequeued objects and there is no need to re-initialized mayfly
job objects.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
When switching from Extended Scanning by Extended
Advertising HCI commands back to Legacy Scanning after a
HCI reset it is required that the coded PHY scanning
context is reset.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Extended Scanning Address Resolution that incorrectly
checked for Bit Count Comparison which is not to be checked
when explicit resolution is performed in the Rx ISR.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use the maximum advertising PDU size time reservation
consider the Advertising Data could be updated from zero to
maximum support size. If maximum time reservation is
disabled then time reservation corresponding to the
Advertising Data present at the time of the start/enable
of Advertising is used.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When multiple advertising sets are support then use advanced
scheduling implementation to place multiple auxiliary PDUs
and periodic advertising PDUs in a non-overlapping schedule.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing recv fifo reset on HCI reset. This fix handles a
scenario where in Rx Prio thread has enqueued a node rx, Tx
thread handles HCI Reset Command, and Rx thread wakes up
from call to k_fifo_get to handle invalid node rx. The
changes here ensure Rx thread does not get any invalid node
rx post HCI Reset Command handled in Tx thread.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When bool is typedef'ed to for instance char the cast from 64 bits
is not so good. Now using an explicit 'cast' to true/false
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Implements PDU flow and unittest of CIS Create on Peripheral
Hooks CIS Create into the controller and fixes a few minor
things in ull to allow for running with NEW LLCP
Also handles CONFIG based comilation of CIS Create
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Hooks the CIS terminate into the controller and fixes a few minor
things in ull_conn(_iso).c
Also handles CONFIG based comilation of CIS_TERMINATE
also fixes a minor issue in helpers_pdu
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
llcp_tx_pause_data() calls ull_tx_q_pause_data() for each pause_mask,
while llcp_tx_resume_data() only calls ull_tx_q_resume_data() when
conn->llcp.tx_q_pause_data_mask == 0 leading to an unbalanced number of
calls to ull_tx_q_pause_data()/ull_tx_q_resume_data() which can leave
the data path of the TX Q paused.
Fix such that only the first call to llcp_tx_pause_data() will pause the
data path of the TX Q.
Add unit test to verify correct pause/resume behavior.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Following zephyr's style guideline, all if statements, including single
line statements shall have braces.
Signed-off-by: Anas Nashif <anas.nashif@intel.com>
Fix radio_tmr_start_now from returning delayed start time
under race conditions where the capture time has elapsed but
the compare has triggered at the same time.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Workaround for nRF52 anomalies 102, 106, and 107 was applied also for
SoCs that were not affected with those, namely nRF52811 and nRF52840.
Since the side effect of this workaround is reduction of sensitivity,
this was highly undesirable.
This commit uses dedicated functions provided by MDK for checking if
a given anomaly applies to the used SoC (and its actual revision) so
that the workaround is applied only when it is really needed.
Signed-off-by: Andrzej Głąbek <andrzej.glabek@nordicsemi.no>
The change in this commit is required to avoid regression errors
on EBQ test for the PHY update procedure
When in the peripheral role transmission of data must be resumed
while waiting for the PHY IND response from peer.
In other words: in the LP_PU_STATE_WAIT_TX_ACK_PHY_REQ state
data transmission must resume when acting as peripheral,
but not when in the central role
Following tests are effected
LL/CON/PER/BV-49-C
LL/CON/PER/BV-50-C
LL/CON/PER/BV-52-C
LL/CON/PER/BV-53-C
LL/CON/PER/BV-54-C
LL/CON/PER/BV-55-C
LL/CON/PER/BV-56-C
LL/CON/PER/BV-58-C
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
This PR fixes the PHY update procedures for conformance tests when
being a Central
The problem was that data was in the LLL tx queue and was still being
queued before the PHY IND was queued (with a given instant).
As a result by the time the PHY IND was transmitted over the air the
instant was in the past.
The fix is to ensure that the LLL tx queue is empty, and to stop
queueing new data before queueing the PHY IND
Following tests are fixed:
LL/CON/CEN/BV-49-C
LL/CON/CEN/BV-50-C
LL/CON/CEN/BV-53-C
LL/CON/CEN/BV-54-C
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Complete the remote initiated version exchange if a LL_VERSION_IND is
received while already having responded in an earlier version exchange
procedure.
Clarify comment regarding how to handle this invalid behaviour.
This has been seen when running the LL/CON/CEN/BI-12-C test on EBQ.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Calculation of the DLE related parameters (rx/tx octets and time) depend
on the actual phy in use. For this reason the PHY settings must be
initialised before doing the DLE parameter calculations
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
On remote terminate on central the conn clean-up would happen before ack
of terminate ind was sent to peer.
Now clean-up is 'postponed' until subsequent event.
Also now data tx is paused on rx of terminate ind to ensure no data is
tx'ed after rx of terminate ind
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
On disconnect with refactored LLCP, if data tx is paused,
possibly 'waiting' tx nodes would not get released.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Only apply change to effective DLE times if current max times are too
small to accommodate. Similar to legacy implementation
Update unit tests to new DLE ntf behavior
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Encryption request is enqueued in thread context from the Tx
buffer pool, so that it is serialized alongwith the already
enqueued data buffers ensuring they are transmitted out to
peer before encryption is setup. Allocate additional Tx
buffers to accommodate simultaneous encryption setup across
active connections.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
- Prevent NULL-pointer dereferencing if datapath is created late
- Support SDU fragment complete-counting for framed case
Signed-off-by: Morten Priess <mtpr@oticon.com>
Implemented incrementing TX SDU fragment count such that it indicates
the number of completed SDU fragments in the PDU being emitted for both
unframed and framed transmission.
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
HCI:
-- Discarded data from HCI ISO Data packets from controller to host if
data has been lost
ISO-AL:
-- Corrected iso_interval in latency calculations
-- Updated handling and release of SDUs for error conditions / padding
at the last PDU for the SDU
-- Updated prioritisation of error status in released PDUs
-- Included error spooling exit on based on payload number to SDU
mapping for unframed reassembly
-- Updated sequence number handling for framed recombination
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Do not use ull_ticker_stop_with_mark for ISO one-shot resume ticker, but
stop without checking result. If active this will stop it, otherwise it
is ignored. Also, this prevents calling lll_disable twice.
Signed-off-by: Morten Priess <mtpr@oticon.com>
- Prioritize CIS_REQ handling in (old) LLCP
- Reject if CIS_REQ uses exisiting CIS ID
These fixes prevent assertions in /LL/CIS/PER/BV-38-C.
Signed-off-by: Morten Priess <mtpr@oticon.com>
Implementing proper validation of PHY selection for PHY UPDATE procedure
Implement connection termination on PHY UPDATE with instant in the past
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Replace k_sem_take loop used for consuming the remaining
sem give counts with k_sem_reset.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix assertion due to multiple mayfly_enqueue calls used
under ZLI when pdu_free_sem_give is invoked from the LLL.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The Configure Data Path command must be included when the read Local
Supported Codecs [v2] command is supported. The Configure Data Path
command is needed when vendor-specific ISO data paths are supported,
but not otherwise tied to ISO. The respective weak function is
therefore moved to ull.c.
Signed-off-by: Wolfgang Puffitsch <wopu@demant.com>
When supporting chain PDUs, after HCI reset the first PDU
allocated did not initialize its next pointer causing use
of unallocated PDUs for chaining while a duplicate of such
PDU buffer being allocated for other states/roles. This
causes in certain cases both Extended and Periodic PDUs
having same data, the Extended Advertising PDU being
transmitted at the instant of the Periodic Advertising.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix BT_CTLR_RX_ENQUEUE_HOLD implementation that stalled
generating the CONN_UPDATE and PHY_UPDATE when there were
no Rx data or Tx acknowledgements to be processed when
the controller was built with BT_CTLR_LOW_LAT_ULL.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add Kconfig option to conditionally enable tickers with slot
window to yield to normal tickers and be placed at the end
of their slot window if possible.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The open source controller did not expose support for shutting it down
via the close() API in the HCI driver. Add support for it, which
completes the support for disabling and enabling the Bluetooth stack in
Zephyr.
Closes#3192.
Signed-off-by: Carles Cufi <carles.cufi@nordicsemi.no>
Allow the controller to be deinitialized, adding the whole chain of
calls:
- ll_deinit()
- lll_deinit()
- lll_clock_deinit()
in order to be able to turn everything off, including the controller's
refcount of the LF clock.
Signed-off-by: Carles Cufi <carles.cufi@nordicsemi.no>
Fix Data Length Request CMD parameter checking to not
restrict invalid maximum Tx time values. This addresses
conformance test cases that provide maximum Tx time values
of 2128 us when not supporting Coded PHY in the Controller
implementation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
If there is a PHY change on a connection it may happen that effective
RX and TX time changes also. That change is applied after an instant.
Implemented handling of effective time calculation is based on the
maximum PDU length, new PHY and local (default) maximum TX or RX time.
The maximum TX value is set to default one that corresponds to PHY 1M
during the Controller initialization. It can be updated by host to other
value. By default Zephyr Host updates it to max possible TX time for all
supported PHYs. If PHY CODED is enabled, it is the longest possible TX
duration 17040 us.
The maximum RX value is set to default during connection creation.
In case of use of legacy advertising, the value is also related with
PHY 1M. It can be updated by data length extension procedure.
If the maximum RX value is set to some value and there is a change
of a PHY to one that requires more time to send a PDU with the same
length, then the maximum RX value is wrongly calculated.
Function pu_calc_eff_time returns a value that is the default_time
argument. The problem is that the default_time should be adjusted
to new maximum RX time required for a new PHY.
To solve that there should be an evaluation of a new maximum RX and
TX time based on new PHY.
The commit adds missing evaluation.
The problem occurred in DF tests that check collision mitigation
between PHY update control procedure and CTE request control procedure.
There was missing CONFIG_BT_CTLR_PHY_CODED option in CTE request
unit tests. The code was working because the ULL implementation of
PHY change control procedure does not verify if PHY CODED is supported.
When missing support was enabled, tests showed wrong evaluation of
maximum RX time. It also unveiled error in CTE request unit tests
implementation. The default_tx_time was set to wrong value 2120 us
as if PHY CODED was not supported. To fix it, the value was changed
to PDU_DC_PAYLOAD_TIME_MAX_CODED.
There was also added a mock for a feature exchange procedure done
during unit tests setup step. That allows to correctly calculate
maximum TX time by ull_dle_max_time_get function.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix filter accept list and privacy feature Kconfig default
based on whether host has them enabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing BT_CTLR_PRIVACY conditional compilations that
included redundant HAL code when Controller privacy is
disabled.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix PHY update procedure to handle unsupported PHY requested
by peer central device. PHY update complete will not be
generated to Host, connection is maintained on the old
PHY and the Controller will not respond to PDUs received on
the unsupported PHY.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fixes issue re. sending packets after sending TERMINATE_IND.
Fixes issue re. erroneous error code on 'timed out' termination (ie
when peer does not ack terminate_ind)
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
On a completion of feature exchange the max DLE times needs to be
updated if Coded PHY has become supported.
For this now also keep a separate store of the default_tx_octets/time
for the sake of re-calculation of local versions of DLE values
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Fix prepare pipeline from not resuming non-resume events
in pipeline when more than one resume events are present
before a non-resume event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When host issue HCI Reset controller should clear LE Static Random
address. Otherwise controller may incorrectly use one from before
HCI reset insread of rejecting HCI commands.
This was affecting following qualification test cases:
HCI/CCO/BI-51-C
HCI/CCO/BI-53-C
HCI/CCO/BI-54-C
HCI/CCO/BI-56-C
HCI/DDI/BI-06-C
HCI/DDI/BI-07-C
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
At least one supported PHY bit shall be set and none of
non-supported or RFU bits should be set.
This was affecting HCI/DDI/BI-05-C qualification test case.
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Removes label experimental for direction finding feature in
Bluetooth Controller.
The feature stays disabled by default because it requires additional
dedicated hardware to be used. Besides that it significantly enlarges
amount of memory used by the Controller.
End user has to enable the feature explicitly by use of configuration
options.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix preempt timeout scheduling to not skip first prepare in
pipeline when there are no previous preempt timeout
scheduled already.
Fix related to commit 27b8beaa22 ("Bluetooth: Controller:
Fix to handle relative short preempt timeout").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Maximum number of CTE to be send in a periodic advertising chain is
limited by BT 5.3 Vol 4 Part E, section 7.8.80 and is 16.
Maximum number of samples CTE in a periodic advertising chain is
limited by BT 5.3 Vol 4 Part E, section 7.8.82 and is also 16.
Both values are limited by amount of memory reserved in Controller
by Kcofigs, respectfully: CONFIG_BT_CTLR_DF_PER_ADV_CTE_NUM_MAX and
CONFIG_BT_CTLR_DF_PER_SCAN_CTE_NUM_MAX.
Functions ll_df_set_cl_cte_tx_params and ll_df_set_cl_iq_sampling_enable
check limits against Bluetooth specification provided values.
That can end with memory overwrite if number of requested CTEs is
greater that number provided in configuration.
The commit changes mentioned functions to validate HCI commands
parameters against configuration values.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
In case there are pending two control procedures: local and remote,
and remote device sends LL_REJECT_IND PDU then assertion happened.
ull_cp_rx function triggers assertion because LL_REJECT_IND is
considered as expected packet for all local and remote control
procedures.
That is not correct. It does not allow local procedure to handle
a response and stops a device on assert.
A remote device should not send LL_REJECT_IND PDU for locally initiated
control procedures, hence local device should not expect to receive
LL_REJECT_IND PDU to be expected one for pending remote control
procedure.
Remote device is allowed to send LL_REJECT_EXT_IND PDU for a locally
initiated control procedures. The LL_REJECT_EXT_IND PDU has a Reject-
Opcode that identifies rejected control procedure, hence is may be
expected by local device.
The commit provides changes that prevent the Controller assertion
in described case.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
CCM during on-the-fly decryption of a received packet starts decryption
when Radio triggers EVETNS_ADDRESS. In case there is possibility a
packet may include Constant Tone Extension, on-the-fly parsing of a
received packet for CTEInfo is enabled.
If there is a PHY 1M enabled the Radio stores received bits with a
delay, that is equal to time required to receive 3 bits. CCM TASKS_CRYPT
related with packet decryption should be delayed by the time the Radio
needs to store received data.
The commit provides changes required to delay start of the CCM
TASKS_CRYPT. It uses NRF_RADIO Bit counter feature. The Bit counter is
configured to trigger NRF_RADIO->EVENTS_BCMATCH on reception of 3rd bit.
The event is connected through PPI with CCM TASKS_CRYPT.
The PPI used is shared with Radio Rate override. That is possible because
direction finding feature is not allowed on PHY Coded and CCM needs a delay
only when used PHY 1M.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
lll_conn_rx_pkt_set function is called before one of radio_switch-
_complete_XXX functions calls in lll_peripheral.c. That prevents
lll_conn_rx_pkt to call any Radio setup related function that touches
NRF_RADIO->SHORTS. NRF_RADIO->SHORTS are assigned in radio_switch_-
complete_XXX functions, hence any change operation on the register done
before is overwritten.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Add initial support for Periodic Advertising Data fragment
operation support.
This commit is limited to detection of partial data if used
before Periodic Advertising is enabled, which will lead to
HCI error reason of command disallowed.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When resolving collision if ticks_slot_window is set for
either of the ticker then skip and such ticker be
rescheduled outside the collision within the
ticks_slot_window.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
[140/235] Building C object zephyr/subsys/bluetooth/controller/
CMakeFiles/subsys__bluetooth__controller.dir/ll_sw/ull_sched.c.obj
In file included from zephyr/subsys/bluetooth/controller/ll_sw/
ull_sched.c:28:
zephyr/subsys/bluetooth/controller/ll_sw/nordic/lll/lll_adv_pdu.h:
In function 'lll_adv_pdu_linked_next_get':
zephyr/subsys/bluetooth/controller/ll_sw/nordic/lll/lll_adv_pdu.h:8:32:
warning: implicit declaration of function 'MROUND'
[-Wimplicit-function-declaration]
8 | #define PDU_ADV_MEM_SIZE MROUND(PDU_AC_LL_HEADER_SIZE + \
| ^~~~~~
zephyr/subsys/bluetooth/controller/ll_sw/nordic/lll/lll_adv_pdu.h:12:11:
note: in expansion of macro 'PDU_ADV_MEM_SIZE'
12 | PDU_ADV_MEM_SIZE - \
| ^~~~~~~~~~~~~~~~
zephyr/subsys/bluetooth/controller/ll_sw/nordic/lll/lll_adv_pdu.h:197:9:
note: in expansion of macro 'PDU_ADV_NEXT_PTR'
197 | return PDU_ADV_NEXT_PTR(pdu);
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Rework instant based procedure complete event generation to be
held until after the on-air instant has elapsed, to have
conditional compilation around the code where the event
generation be held or immediately dispatched so that it
improves readability.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix instant based procedure complete event generation to be
held until after the on-air instant has elapsed.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
If peer sents invalid value in DLE request or response just ignore
those and keep using old values when calculating effective DLE.
This was affecting following qualification test cases:
LL/CON/PER/BI-10-C
LL/CON/PER/BI-11-C
LL/CON/PER/BI-12-C
LL/CON/CEN/BI-07-C
LL/CON/CEN/BI-08-C
LL/CON/CEN/BI-09-C
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Terminate connection when Connection Update with instant in the past
Fix type re. win_offset calc in conn update ind pdu decoder
Remove feature bit on unsupported in peer
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Upon collision either the error code for different procedure
collision or same procedure collision must be transmitted,
which is fixed in this PR. Previously always the error code
for same procedure collision was sent
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Add Extended Advertising Type validation when associated
Periodic Advertising is enable, and Extended Advertising
set is re-configured to other advertising types.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
There is an error. CTE request control procedure can be run in single
shot or periodic mode. In case of run in single show, it is not
disabled after completion.
The code responsible for the disable was deleted by commit:
ac7d0506f88508e7440288c1ec4319a9f7d0ad44.
The cte_req.is_enabled should be set to zero if the CTE request
completes and cte_req.req_interval is zero.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
There was missing code responsible for handling of unexpected response
for CTE request. The commit adds code that will terminate connection
in case a peer device reposnes with unexpected control PDU that is not
a remote procedure reques.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The CTE request procedure should be enabled only if a peer supports
CTE response feature. That information can be obtained by feature
exchange procedure. If there were no feature exchange then CTE
request feature may be disabled if a peer responses with LL_UNKNOWN_RSP
for a CTE request.
The implementation of ll_df_set_conn_cte_req_enable was checking if
CTE response feature is supported only when there was feature exchange.
There was missing possibility to stop CTE request if a peer responded
with LL_UNKNOWN_RSP for an earlier CTE request.
The commit changes the implementation of ll_df_set_conn_cte_req_enable.
The CTE response feature check is moved to ull_cp_cte_req function,
because it belongs more to control procedure than to function that
handles Host request to start the procedure.
Second change is related with use of conn->llcp.fex.features_used.
It stores information about features supported by peer. It does
not depend on execution of the feature exchange control procedure.
By the way, there were removed else statement in ll_df_set_conn_cte_-
req_enable because it was not needed.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
There was missing handling of LL_UNKNOWN_RSP in CTE request control
procedure.In case there is a pending CTE request and peer responses
with LL_UNKNOWN_RSP then Host should be notified with HCI_LE_CTE_-
Request_Failed event. The pending CTE request procedure should be
completed.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix handling of AD Data set with operation type of
unchanged data with respect to invalid parameter and
state of Periodic Advertising.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix nRF51x series advertising channel PDU S1 byte
configuration regression, that causes corrupted advertising
PDUs being reported to Host, by adding the missing bits_s1
local variable initialization.
Regression introduced in commit 1dcbe73cc8 ("Bluetooth:
controller: radio: add setting of S1 byte in radio packet").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Current implementation of ll_sync_create_cancel does not allow to stop
synchronization after ull_sync_setup is called. When that is done,
sync->timeout_reload is not zero and the ll_sync_create_cancel will
return BT_HCI_ERR_CMD_DISALLOWED. That means the Controller is able to
cancel periodic advertising synchronization only in period between
call to ll_sync_create and reception of AUX_ADV_IND that has SyncInfo
field.
The Controller should be able to cancell synchronization until first
AUX_SYNC_IND PDU is received and host notified about synchronization
established.
Complete information about synchronization status is provdied by two
ll_sync_set members: node_rx_sync_established and timeout_reload.
These two members of the structure were used in ll_sync_create_cancel
function to do a proper cancel and cleanup.
The node_rx_sync_established member was not cleared when sync was
established or expired. That was required to get a proper information
about synchronization state.
Besides that, to avoid race condition between ll_sync_create_cancel
and ull_sync_established_report, the latter function was extended
to check if cancel operation or sync lost has happened.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Remove experimental label from Advertising Extensions and
Periodic Advertising features in the Controller.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
This PR sets the refactored LLCP as the default instead of legacy
so that more people will use this, giving us more feedback
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
Direction finding functionality does antenna switching during CTE
reception in AoA mode and CTE transmission in AoD mode. Antennas are
switched according to user provided antenna switch pattern. If a CTE
length is enough to exhaust all antenna ids in a switch pattern then
radio should loopback to reference antenna and continue from switching
from that. Current implementation loops back to antenna that is just
after reference antenna in the switch pattern.
The commit fixes that by insertion of the reference antenna
at the end of switch pattern. Radio will operate as it was before,
it will restart switching from the same index in a switch pattern.
At the same time reference antenna will be inserted into the loop
if switching pattern is exhausted. That also means, the maximum
number of antenna ids in a switch pattern has to be decreased by
one.
The commit also fixes lower bound in the BT_CTLR_DF_MAX_ANT_SW_PATTERN-
_LEN that should be equal two. It was set to three, because in the
past the antenna at index zero was used for reception of a PDU.
Now this antenna ID is provided by device tree configuration.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The SYNC_STAT_READY_OR_CONT_SCAN state into two: SYNC_STAT_READY
and SYNC_STAT_CONT_SCAN. The connected state was used for two
cases:
- synchronization with periodic advertising is already established,
- CTE type is wrong but periodic advertising list is used to filter
synchronized devices.
In the past states were connected because there was only one difference
between them. In case of sync already established, Controller generated
sync report notification to host.The sync was not terminated when
Controller was about to continue search for other periodic advertiser.
The state was split because now Controller terminates sync ticker and
continues search for other periodic advertised. The split improves
readability and makes code easier to understand.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
In case of use of filtering based on: periodic advertising list and
CTE type, the synchronization can hang. That is possible if a periodic
advertiser uses wrong CTE type. In such situation the sync is not
released in ull_sync_done call. What more the sync->timeout_reload
is not cleared and Host is not able to cancel the synchronization.
The periodic advertising is in a semi-sync-established state.
There are no reports send to Host. Host can't use the sync set to
synchronize with other device. It is only able to terminate the
sync (call to ll_sync_terminate).
To fix the issue following changes should be applied:
- isr_rx_adv_sync_estab should call isr_rx_done_cleanup
with sync_term parameter in case the sync_ok isn't SYNC_STAT_ALLOWED.
In any case the CTE type is wrong, no matter is the periodic
advertising list filtering is enabled or not.
- ull_sync_established_report should set sync->is_term to true
in case the CTE type is not allowed. That change is required for devices
that do not support Direction Finding Extension. For those devices CTE
type based filtering is done in ULL by ull_sync_established_report
function. The sync->is_term should be set unconditionally, hence is
moved up in the function.
With these two changes done, ull_sync_done function will execute
sync_ticker_release in case the CTE has wrong type. ULL, depending on
notifications prepared by ull_sync_established_report, will follow up
on sync termination if required.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The periodic CTE_REQ disable command, requested by Host, may be locked
until connection is dropped due to missing CTE_RSP from peer device.
That is caused by implementation of CTE_REQ disable and CTE_REQ
control procedure handling.
The procedure is marked as active when CTE request was send to peer
device. It is marked as inactive after completion of the procedure.
That caused locking of CTE disable on a semaphore.
The BT 5.3 Core Spec, Vol 4, Part E, section 7.8.85 says the HCI_LE_-
Connection_CTE_Request_Enable should be considered active on a conne-
ction from when Host successfully issues the command with Enable=0x1
until a command is issued with Enable=0x0 or single LLCP CTE request
has finished (CTE_Request_Interval=0x0). Also there is a clarification
from BT SIG that the command with Enable=0x0 does not affect any
initiated LLCP CTE request. That means Controller is allowed to finish
already started procedure and it is not allowed to start new LLCP CTE
request procedure after completion of the command with Enable=0x0.
Taking that into account, there is no need to synchronize ULL and LLL
in regard of disable the LLCP CTE request while the procedure is
pending. Controller is free to complete the procedure or terminate it.
The change removes all code related with cte_req.is_active, disable
callback and waiting of ULL for LLL to finish the LLCP CTE request.
The ULL will complete the HCI_LE_Connection_Request_Enable with
Enable=0x0 immediately. In case the procedure is disabled in before
the response arrives, then further processing of the response is
dropped and the procedure context released.
The context is not released by the code responsible for disable
handling, to have single place where it is done.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
There is an error in the condition that checks if new CTE_REQ should
be started after end of connection event. The condition verifies if
counter req_expire is set to zero. Then new CTE_REQ is started
irrespectively to CTE_REQ being disabled.
req_interval is used to store information if the CTE_REQ is:
- periodic, then value doesn't equal zero,
- single shot or disabled, then value equals zero.
The condition should verify if the req_interval is not zero and
req_expire is not zero. The second part of the if condition is
required to avoid starting next CTE_REQ until last one has been
completed.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Some of control procedures has set ctx->rx_opcode in rp_comm_tx
function to values that state there is an expected PDU.
This is not always true. In case of procedures that do not expect
any response from remote device, the ctx->rx_opcode should be set
to PDU_DATA_LLCTRL_TYPE_UNUSED.
In the worst cases scenario, when the same control procedure
is executed locally and remotely, correct response PDU may
cause an assertion in ull_cp_rx. It could happen because
of wrong ctx->rx_opcode value. A packet with opcode that is
set in remote and local control procedure context rx_opcode
will be treated as expected value for both. That is a situation
that cannot happen.
The commit changes the assignments of rx_opcode to fix the problem.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
This commit fixes the build errors for the testcases in
the tests/bluetooth/init folder
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
The tests/bluetooth/ctrl_user_ext test fails due to
compilation errors, which are fixed with this PR
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
In order to bring consistency in-tree, migrate all subsystems code to
the new prefix <zephyr/...>. Note that the conversion has been scripted,
refer to zephyrproject-rtos#45388 for more details.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Strictly restrict AD Data length to BT_CTLR_ADV_DATA_LEN_MAX
when there can be free bytes in Advertising PDU with common
extended header format of less that the maximum 64 bytes.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
In a function pu_prepare_instant there is a condition that
checks if there is actual change of a PHY. That condition
was based on ctx->data.pu.tx and ctx->data.pu.rx.
These members store PHY that is or will be used, hence
the condition is wrong. Even there is no actual change in
the PHY, values could be not equal to zero. In such case
the instant value would be set to wrong value.
What more the condition be an 'or' not an 'and' because
one of the values must be different than zero to have the
PHY change and instant different than zero.
After update of the condition, the function call places
must be changed. The ctx->data.pu.c_to_p_phy and
ctx->data.pu.p_to_c_phy are set in pu_prepare_update_ind
function, hence pu_prepare_instant should be called after
that.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
- ISO TX data path for HCI and support for vendor path
- ISO-AL segmentation of framed PDUs
- Insertion of segment headers
- Reconstruction and storing of CIG reference point in ULL
- Calculation and insertion of of Time-Offset
- Exit error spooling in ISO-AL on detecting start
- ISO-AL TX unframed fragmentation
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Signed-off-by: Morten Priess <mtpr@oticon.com>
Add implementation to generate node rx for missing ISO PDUs
and set the status as invalid. This is required for ISOAL to
correctly track the sequence numbers for every SDU interval.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add Kconfig to limit the Primary Advertising Interval and
Periodic Advertising Interval maximum supported values in
the Controller implementation.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
None of the common DF configs should depend on using BT_LL_SW_SPLIT.
Added dependencies to it where this was the case.
Signed-off-by: Rubin Gerritsen <rubin.gerritsen@nordicsemi.no>
These configurations are tighlty coupled to the implementation,
so these should be hidden when not using BT_LL_SW_SPLIT.
Signed-off-by: Rubin Gerritsen <rubin.gerritsen@nordicsemi.no>
Some controllers may support only TXing or RXing CTE.
As all DF features are guarded by BT_CTLR_DF, we need to ensure
that it is possible to select those when only TX or RX is available.
Signed-off-by: Rubin Gerritsen <rubin.gerritsen@nordicsemi.no>
In case a connection is encrypted received PDU is decrypted by CCM.
CCM does not encrypt/decrypt S1 byte that stores CTEInfo.
In case of reception of a PDU by encrypted connection there is missing
CTEInfo in a memory where CCM stores decrypted PDU.
The CTEInfo data must be copied from scratch packet.
The commit adds code responsible for copying of the CTEInfo into
target PDU memory.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Terminate connection with a MIC failure if an unexpected control PDU
is received during the Encryption Start procedure.
Add a greedy option to pdu_is_expected() to make sure the procedure
processes all unexpected control PDU in all cases.
Add unit test inspired by Bluetooth Qualification test
LL/SEC/CEN/BV-14-C,
Central Receiving unexpected PDU during encryption start
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Add support for both LL_REJECT_IND and LL_REJECT_EXT_IND when waiting
for the the response to the LL_ENC_REQ and LL_START_ENC_REQ.
Add unit test to test both LL_REJECT_IND and LL_REJECT_EXT_IND as
responses to LL_ENC_REQ.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Chose correct rejection PDU based on features supported on remote peer
when rejecting due to missing LTK.
Update unit test setup with faking that a feature exchange procedure
has run.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Terminate connection with a MIC failure if an unexpected control PDU
is received during the Encryption Start procedure.
Add unit test inspired by Bluetooth Qualification test
LL/SEC/PER/BI-05-C,
Peripheral Receiving unexpected PDU during encryption start
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
This adds suport for validation of received PDUs before they are
pass further to LLCP state machines. If PDU size is invalid it is
rejected with LL_UNKNOWN_RSP.
This was affecting following qualification test cases:
LL/PAC/PER/BI-01-C
LL/PAC/CEN/BI-01-C
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Instead of waiting one connection interval, as a result of the state
change, perform the check for instant already on reception of
CONNECTION_UPDATE_IND
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Compile out misc. members not used when Connection Parameter Request
is not supported.
Implement missing tests re. unsupported features in CU/CPR procedure
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
When a running procedure receives a REJECT or UNKNOWN_RSP PDU that is
not an expected part of the procedure flow this leads to termination
of the connection
This affects procedures:
CU/CPR, CTE, PHY, PING, DLE, FEX, VEX, CHMU
Unit tests are updated to cover the updated behaviour.
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Rewrite the entire Procedure Response Timeout mechanism.
Use two separate timers for local and remote initiated procedures.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
As per bluetooth spec Vol. 6 part B section 5.3 we need to terminate
the connection under given situation
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
BT Core spec 5.3 Vol 6, Part B section 2.4.23 LL_PHY_UPDATE_IND says:
"If both the PHY_C_TO_P and PHY_P_TO_C fields are zero then there is no
Instant and the Instant field is reserved for future use."
Fields that are reserved for future shall be filled with zeros.
New LLCPs implementation didn't handle this case and set the instant
as if there were a PHY change. That caused qualification tests to fail.
The commit fixes the issue.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The Tx interval is now calculated at the beginning
of the Tx test and the next transmission is
triggerd by the switch timer instead of event
timer. This fixes a corner case issue when
timer rollover.
Signed-off-by: Kamil Gawor <Kamil.Gawor@nordicsemi.no>
When Host calls HCI_LE_Connection_CTE_Request_Enable with cte type
set to AoD with 1us slots or AoD with 2 us slots, the Controller
verifies if peer device supports Antenna Switching During CTE
Transmission (AoD) feature.
That is wrong because the feature is marked as optional when send
to peer, so it shall be igonerd by remote device.
There are no means to check if peer device supports particular
CTE type, hence the check has to be removed.
The check causes enable CTE REQ procedure to fail after feature
exchange has happened.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The CTE request procedure can be run in periodic and non-periodic mode.
In periodic mode it stays enabled until Host call HCI_LE_Connection_CTE-
_Request_Enable(Enable=0x0).
In non-periodic mode the command is disabled after completion,
LL_CTE_RSP is successfully received.
There is missing disable of the procedure in the current code,
so Host is not able to run the command HCI_LE_Connection_CTE_Request_-
Enable(Enable=0x1) again without explicit call to HCI_LE_Connection_-
CTE_Request_Enable(Enable=0x0).
The commit adds missing code responsible for disable of the procedure.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix assert on LL BIG terminate call before BIG sync is
established. Assert was caused due to duplicate calls to
release stream contexts, once in LL BIG terminate function
then when releasing the HCI BIG sync failed to be
established node rx was being released.
Use iso_broadcast and iso_receive samples, power cycle the
iso_broadcast device when iso_receive sample is waiting for
BIG sync to be established, iso_receive sample will perform
a BIG sync terminate that leads to the assert.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
HCI_LE_CTE_Request_Failed may be generated in case received LL_CTE_RSP
PDU didn't contain CTE or if peer rejected the request. HCI function
encode_data_ctrl responsible for dispatching received control PDUs
should not expect a PDU with PDU_DATA_LLCTRL_TYPE_CTE_REQ opcode.
It should never happen. The correct opcode here is PDU_DATA_LLCTRL_TYPE-
_CTE_RSP.
Result of this issue is an assert when LL_CTE_RSP PDU is received
but it does not include CTE.
The commit fixes the problem.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
PR44014 introduced new pause logic for procedures but PR44297
was merged without being update to use it.
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Now refactored Connection Parameter Request procedure supports
parameter checking, and implements reject_ext_ind on invalid parameters
Updates to TODO description for remaining work
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
The event counter value for connection and periodic advertising
events is updated to next value during event preparation (in one
of prepare_cb functions in LLL).
IQ report is prepared after event preparation, so value of event
counter is ahead of the current event value by one, hence it has
to be subtracted.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
HCI_LE_Connectionless_IQ_Report and HCI_LE_Connection_IQ_Report
events has fields that store event counter values: Periodic_Event_-
Counter and Event_Counter, respectively.
Values assigned to this HCI events are taken directly from
lower link layer objects. In case of too slow processing of
HCI events values provided by LLL contexts could be changed before
HCI sends events to Host. That can happen e.g. in case of short
periodic advertising interval and slow UART baudrate.
In such situation event counter values will be corrupted.
To prevent that situation, event counter values connected with
IQ sample reports, has to be stored in node_rx_iq_report when
a report instance is filled in LLL.
This commit introduces required changes.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Change CONFIG_BT_RECV_IS_RX_THREAD into a
choice:CONFIG_BT_RECV_CONTEXT with the following options
(names can be discussed further of course):
CONFIG_BT_RECV_BLOCKING
CONFIG_BT_RECV_WORKQ_BT
CONFIG_BT_RECV_WORKQ_SYS
This way users would be able to choose what to run most of
the BLE stack on, they wouldn't be forced to a single model.
We would default to CONFIG_BT_RECV_BLOCKING so that we wouldn't
need to change the system workqueue stack size by default, instead
asking users to do so if they select the CONFIG_BT_RECV_WORKQ_SYS option
Signed-off-by: Lingao Meng <menglingao@xiaomi.com>
Fix null pointer dereference in Controller when receiving an extended
advertisement and CONFIG_BT_LOG_LEVEL_DBG is enabled.
Signed-off-by: Pieterjan Camerlynck <pieterjan.camerlynck@gmail.com>
Add implementation in Controller to set radio high voltage
to enable support for +3dBm Tx Power in nRF53 Series SoCs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add radio_stop interface that will be called on radio event
done. This interface can be in turn used to perform H/w
dependent cleanup for every Radio event done.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
When an int16_t I or Q value was input to IQ_CONVERT_12_TO_8_BIT
the compiler would not make the correct comparison with
IQ_SAMPLE_STATURATED_16_BIT causing saturated IQ samples never
being found.
Signed-off-by: Jakob Krantz <jakob.krantz@u-blox.com>
Fix Extended Scan disable and Periodic Synchronization
terminate to cover scenarios where chain PDU reception could
complete while thread context is waiting for the radio event
to be done.
Changes here ensure auxiliary context is not released twice
which is caught as an assertion in flush() when checking for
validity of aux->parent pointer.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing return value check when Periodic Synchronization
Auxiliary PDU reception has already been stopped, this can
be due to PDU reception in LLL completing while stop has
been requested.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add additional assertion check in the control path leading
to auxiliary context release to catch regressions that may
lead to duplicate auxiliary context release.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing execution of Tx demux for LOW LAT ULL variant
which caused connection events not being maintained to
transmit the latest Tx Data enqueued while being inside a
connection event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
There was an extra call to llcp_lr_init and llcp_rr_init, which is
removed in this commit
Signed-off-by: Andries Kruithof <andries.kruithof@nordicsemi.no>
llcp_lr_pause()/llcp_rr_pause() only pauses currently pending procedures
in their respective request machines, any future initiations are not
paused, thus they are allowed to run, when the opposite was expected.
Change the procedure pause logic into a global pause on the request
machines them self, this is essence what the per-procedure pause
flag was trying to achieve.
Add new query function llcp_?r_ispaused() to not expose the logic behind
the pause functionality.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Change LLCP TX data pause into using mask to allow for pausing from
multiple different sources - but only once per source
(the underlying TX queue still just has an integer counter).
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
The PHY update procedure may trigger a DLE update in certain
situations
When a limited number of rx buffers is available there may not be
enough for doing the phy update and dle update notifications
at once.
Fixes#41788
Signed-off-by: Andries Kruithof <Andries.Kruithof@nordicsemi.no>
Rewrite ull_cp_rx to handle the following cases:
(1)
Local active procedure
Unexpected local procedure PDU
Remote active procedure
Unexpected remote procedure PDU
=> Invalid Behaviour
(2)
Local active procedure
Unexpected local procedure PDU
Remote active procedure
Expected remote procedure PDU
=> Process PDU in remote procedure
(3)
Local active procedure
Expected local procedure PDU
Remote active procedure
Unexpected remote procedure PDU
=> Process PDU in local procedure
(4)
Local active procedure
Expected local procedure PDU
Remote active procedure
Expected remote procedure PDU
=> This cannot happen
(5)
Local active procedure
Unexpected local procedure PDU
No remote active procedure
=> Process PDU as a new remote request
(6)
Local active procedure
Expected local procedure PDU
No remote active procedure
=> Process PDU in local procedure
(7)
No local active procedure
Remote active procedure
=> Process PDU in remote procedure
(8)
No local active procedure
No remote active procedure
=> Process PDU as a new remote request
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Fix connectable advertising to not use uninitialized
secondary PHY value to set the max_tx_time and max_rx_time
for a non-extended connectable advertising context.
The symptoms being Data Length Update event being generated
when peer central initiated Data Length Update Procedure
does not change from default 27 byte 328 us values.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Offset the Coded PHY scan window by 1M PHY scan window
duration so that when 1M PHY scan window is less than
scan interval then Coded PHY scan window can utilize the
radio thereafter for its scan window duration. For
example, with 20 ms interval and 10 ms window there can
be 10 ms 1M PHY followed by 10 ms of Coded PHY scanning.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Introduce a timeout to get HCI event buffer when preparing
Extended and Periodic Advertising reports. This will prevent
silent hanging of Controller in case of insuffient Rx buffer
configurations.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
This fixes Radio Rx when switching back-to-back is
used and device support CTE. For the CTE reception we need to use
PHYEND->DISABLE short instead of END->DISABLE short.
Using NRF_RADIO_SHORTS_PDU_END_DISABLE short handles
both cases.
Signed-off-by: Kamil Gawor <Kamil.Gawor@nordicsemi.no>
Update Controller to use uint16_t instead of uint8_t to
allow buffer counts to exceed beyond 255. Also fix pointer
arithmetic from being restricted to uint16_t that prevented
calculating the memory index for large offsets. This will
now allow support for 250 simultaneous connections, limited
by ticker_id type being uint8_t.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add Kconfig dependency to disable use of Force MD feature
when using LOW LAT ULL variant of the Controller.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
NULL structure fields before releasing memory back to pool.
Add assertion check to prevent NULL pointer dereferencing of
node rx.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Getting rid of TODOs that are fairly straight forward to resolve
* introduce role checks in ENC API
* Remove ASSERT on re-rx of LL_VERSION_IND, ignore instead
* in tests/.../ctrl_chmu: rename variable and initialize initial ch map
* in tests/.../mock_ctrl/util.c: Changing TODO into FYI
* in tests/.../helper_features.h update mask and remove TODO comment
* in ull_llcp_remote.c: re-order cases in proc_with_instant switch
* in ull_conn_upd.c: PARAM REQ only uses REJECT_EXT_IND
* in ull_llcp_common.c: in CENTRAL on rx of LL_MIN_USED_CHANNELS_IND
chose to do nothing re. channel map. Update unit test accordingly
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Instead of selecting appropriate HAS_HW_NRF_* options for particular
nRF SoCs (and simulated nRF52 target), set their values basing on
information from devicetree.
Correct also semantics of those options so that they are set only when
a corresponding DT node is enabled. This allows using them directly in
Kconfig dependencies of Zephyr drivers for nRF peripherals. Update
appropriately these dependencies.
Signed-off-by: Andrzej Głąbek <andrzej.glabek@nordicsemi.no>
When PHY is set to 1M, due to missed "break" statement of switch/case
the sample_offset will be set to the corresponding values of 2M
which causes improper function of sampling CTE signals.
By adding "break" statement the problem has solved.
Fixes: #44296
Signed-off-by: Saleh Mehdikhani <saleh.mehdikhani@unikie.com>
The lll_filter is used for rl_filter and fal_filter. Size of bdaddr
must be big enough for the worst case.
Signed-off-by: Marek Pieta <Marek.Pieta@nordicsemi.no>
Conditional compile ISOAL implementation to support ISO
Broadcast only and ISO Receive only application builds.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix compile error, compiling the connectionless direction
finding samples, due to missing include file.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Periodic Advertising Synchronization time reservation
updated when enabling/disabling direction finding IQ
sampling.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
In case the CTE request was executed as a single shot and Controller
successfully received LL_CTE_RSP PDU there was an assertion.
The assertion was caused by not completely prepared notification PDU.
The notification PDU was send towards Host by CTE request handling code
due to an error in lp_comm_complete function. If the CTE request was
single shot it went into wrong if-else statement, despite that the
LL_CTE_RSP was correctly received.
A check if-clause if the procedure is periodic should not affect the
procedure completion. It should affect whether req_expire counter has
to be restored.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The antenna number returned by controller if antenna switching is not
enabled was zero. That is not compliant with BT 5.3. Core Spec Vol 4.
Part E section 7.8.87. In this situation returned value should be 1.
There is always single antenna available that is responsible for PDU
reception and transmission.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix implementation to be able to establish synchronization
when scan filter accept list is in use and periodic
synchronization needs to be established using specified peer
address or using periodic advertiser list.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The CTE request has two parts: transmission of a CTE request and
reception of a CTE request. The outcome of reception of a CTE request
is transmission of CTE response.
In the new_proc_lut table for allowed remotely requested control procedures
the CTE request was quarded by CONFIG_BT_CTLR_DF_CONN_CTE_REQ.
In case of a build where CTE request is not enabled but CTE response is
the receiver part of CTE request should be enabled also.
The entry in the new_proc_lut should be quarded by CONFIG_BT_CTLR_DF_CONN_-
CTE_RSP.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The Kconfig function "dt_node_has_prop" was using label as its
parameter, where other functions use either chosen or path.
The documentation says that the parameter is path, so this patch
makes the function as documentation says and as other functions
in the file.
The additional nodelabel functions were added as counterparts that
are using nodes labels instead of paths.
Signed-off-by: Michał Barnaś <mb@semihalf.com>
Fix scan aux context release when (ULL) ticker scheduling
fails due to overlapping events (example a new scan window)
and aux context being released before scan aux done event is
processed, caused assertion when processing the done event
with corrupt ULL reference count.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Increase the event done max count when supporting Extended
Scanning with Coded PHY support, wherein prepare queue will
hold an extra resume prepare when both 1M and Coded PHY
are enabled in continuous scanning.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use ticker yield interface to allow chain PDU reception that
overlaps with currently reserved time for received PDU.
Without the yield ULL scheduling to receive auxiliary PDU
fails to be scheduled using ticker.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing use of EVENT_TICKER_RES_MARGIN_US and receive
chain delay in the calculation of overhead value that
determines if ULL or LLL scheduling to be used to receive
auxiliary PDUs.
Also, fix missing use of EVENT_TICKER_RES_MARGIN_US when
ULL scheduling for reception of auxiliary PDU.
See also commit 544acb9804 ("Bluetooth: controller: Fix
missing EVENT_TICKER_RES_MARGIN_US").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use the back-to-back receive of PDU with a
configurable inter frame spacing. This fixes an issue
when nRF53 was able to receive only one Rx PDU and
was not able to switch to next Rx.
Signed-off-by: Kamil Gawor <Kamil.Gawor@nordicsemi.no>
Add Radio interface to perform back-to-back receive of PDU
with a configurable inter frame spacing.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
This command is used to obtain 'Implementation eXtra Information for Test'
(IXIT) values that are required to proceed with BT qualification tests.
Signed-off-by: Tim Sørensen <tims@demant.com>
Fix uninitialized param field when generating incomplete
no more data to come periodic advertising report.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix generating periodic advertising reports post sync
terminate under race condition when disabling reporting or
terminating the sync or while performing HCI reset.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Added BUILD_ASSERT definition to check for safe access to
memory pool allocated memory structure member after the
memory has been released back to mem pool.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
- Implemented ISO-AL TX interface functions for fragmentation of
unframed PDUs
- Implemented ISO-AL source construct and its creation for an input
data path
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Use the received coding scheme when receiving Periodic
Advertising PDUs for correctly calculating the receive
chain delay and on-air PDU time.
Relates to commit 6911e7e1d8 ("Bluetooth: Controller: Use
the received coding scheme when scanning").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use the received coding scheme when receiving Extended
Advertising PDUs for correctly calculating the receive
chain delay and on-air PDU time.
Relates to commit 6911e7e1d8 ("Bluetooth: Controller: Use
the received coding scheme when scanning").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix compile error when debug pins are enabled for nRF53
Series SoCs.
Regression introduced in commit 743b0583fc ("Bluetooth:
controller: Enable debug pins with TF-M enabled").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing assignment of SID in the Periodic Advertiser
Accept List. This cause advertisers with SID 0 only to be
accepted when using list.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Tx Power field in Extended and Periodic Advertising
for chain PDU reception. Tx Power shall be from the
current PDU containing the AD Data, Scan Response Data and
from first PDU of Periodic Advertising Data be used to
prepare the HCI report.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
The header file radio_df_vendor_hal.h was conditionally copiled in.
There were a dependency on a CONFIG_BT_CTRL_DR. The dependency is
removed because radio_df_vendor_hal.h and radio_df.h hasn't got any
DF related type dependencies. What more it allows to use IS_ENABLED
for code that uses types and functions defined in radio_df.h.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The EVENTS_CTEPRESENT is available when radio peripheral has
direction finding support. The event is set if received
PDU has CTEInfo and there were collected IQ samples during
CTE reception.
The event should be cleared always when other events are cleared.
That guarantees that the event is not set when use of radio for
following activities.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
The radio_df_cte_ready function returns state of EVENTS_CTEPRESENT.
The function may not be used in create_iq_report function, because
it is called after lll_isr_rx_status_reset. The lll_isr_rx_status-
_reset clears EVENTS_CTEPRESENT value.
The result of this calls chain is lack of IQ sample report no matter
if the PDU has CTEInfo and radio has collected IQ samples.
To fix the problem, state of EVENTS_CTEPRESENT has to be get when
e.g. rssi_ready is get.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
As Extended Advertising primary PDUs do not use ticker
remainder value for fine scheduling of radio events, do not
use the remainder value for auxiliary PDUs. This fixes the
jitter in the aux_offset value that caused the auxiliary PDU
being observed to be late compared to the aux_offset value
filled in the primary PDUs.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
This adds support for the following Direct Test mode
commands:
- HCI LE Receiver Test [v3]
- HCI LE Transmitter Test [v3]
- HCI LE Transmitter Test [v4]
Those commands set add a possibility to test an CTE
reception and transmission. The HCI LE Transmitter
Test [v4] commands allows also setting a transmit power.
Signed-off-by: Kamil Gawor <Kamil.Gawor@nordicsemi.no>
If peer sends invalid data length in response IUT should fix those
when calculating effective data length.
This was affecting following qualification test cases:
LL/CON/PER/BI-10-C
LL/CON/PER/BI-11-C
LL/CON/PER/BI-12-C
LL/CON/CEN/BI-07-C
LL/CON/CEN/BI-08-C
LL/CON/CEN/BI-09-C
Signed-off-by: Szymon Janc <szymon.janc@codecoup.pl>
Avoid pre-empting scan window when extended active scanning.
If a scan request has been transmitted, then avoid being
pre-empted at the end of window when in continuous scanning.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix power amp for transmitting of chain scan response
wherein capture of PDU end timestamp was missing causing
power amplifier from not being enabled for first chain PDU.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix auxiliary context from being flushed when scanner or
periodic synchronization is stopped, to avoid using the
disable_cb by both. Fixes an assertion when this race
condition happens.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Do not enqueue NODE_RX_TYPE_RELEASE into Auxiliary context
when stopping scanner, as this type is not to be passed to
HCI processing, which would lead to assertion.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix auxiliary context leak on stop, under race condition
where ULL High execution context does not release the
auxiliary context as stop has been requested, and done
has decremented the auxiliary context's reference count.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix the order of Periodic Synchronize reset during HCI
Reset Command. Perform scan reset last after Periodic
Synchronize reset to avoid resetting the auxiliary
context which may be in use by Periodic Synchronize.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Instead of including from nrfx_glue.h a specific Zephyr Bluetooth
controller header file that defines PPI and GPIOTE resources to be
reserved for exclusive use by the controller, include a file with
only a fixed name and expect the chosen Bluetooth controller to
provide the location of this file in include paths. This way, when
a different Bluetooth controller implementation is used downstream,
a different file can be easily pointed to.
Signed-off-by: Andrzej Głąbek <andrzej.glabek@nordicsemi.no>
Rename
BT_CTLR_LLCP_PROC_CTX_BUF_NUM
to
BT_CTLR_LLCP_LOCAL_PROC_CTX_BUF_NUM
to match naming scheme of
BT_CTLR_LLCP_REMOTE_PROC_CTX_BUF_NUM
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Add a separate procedure context pool for remote initiated procedures.
Make it configurable in size by BT_CTLR_LLCP_REMOTE_PROC_CTX_BUF_NUM.
Fix all unit tests referring to the amount of free context buffers.
Fixes#41823
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Move the mem_pool structure to the internal header for wider access.
Introduce a mem_pool owner in the proc_ctx, sch that multiple mem_pool
could be used for memory management of proc_ctx, also static 'foreign'
allocated proc_ctx would be supported by this.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Start of the antenna switching and sampling CTE is configured by use
of DFECTRL2 register in Nodric Radio peripheral. As of now the
configuration was set to defaults, so antenna switching has started
immediately after CTE procedure was started (end of CRC).
Sampling was started at the very beginning of a sampling slot.
It should be delayed for at least 125 ns from beginning of sampling
slot and not more than 125 ns to the end of sampling slot. This is a
requirement from BT 5.3 Core specification Vol 6, Part B section 2.5.4
IQ sampling.
Although it seems to me that when samples are taken depends on
implementation and used hardware. Taking that into account
there is provided a set of KConfig options to configure samples
offset for PHY 1M, PHY 2M and sapling slots 1 us and 2us separetely.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
If there is enabled support for ADI in periodic advertising and
periodic advertising uses chained PDUs there is an assert when
periodic advertising is re-enabled.
There is missing a code that will set a chain for PDU with
updated ADI field.
The commit fixes the issue.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Check if the CTE was discovered by Radio peripheral should be
done with use of CTEPRESENT event. Samples count should not
be used for that purpose. If samples count is a value different
than zero for PDUs that don't have CTE, unwanted IQ samples
report will be generated. CTEPRESENT event is set only in case the
CTEInfo filed was correctly parsed by Radio peripheral during
PDU reception.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
According to Kconfig guidelines, boolean prompts must not start with
"Enable...". The following command has been used to automate the changes
in this patch:
sed -i "s/bool \"[Ee]nables\? \(\w\)/bool \"\U\1/g" **/Kconfig*
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Fix Extended Advertising implementation to setup Power
Amplifier (PA) GPIO toggle for transmission instead of
incorrect Low Noise Amplifier (LNA) setup which is for
reception.
Relates to commit 4e5290948e ("Bluetooth: Controller: Fix
Periodic Advertising to setup Power Amp").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Do not implicitly allocate Rx buffers for maximum chain PDU
reception. Instead let applications increase as required the
Kconfig CONFIG_BT_CTLR_RX_BUFFERS.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing configure of Device Address Matching when
receiving auxiliary PDUs.
This fixes some privacy related conformance test cases.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing RPA timer start in Broadcaster only controller
builds.
Without the fix private resolvable addresses where not
updated at RPA timeout.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing implementation to update private resolvable
address in auxiliary PDUs on RPA timeout.
Without the implementation the controller asserted on RPA
timeout when AdvA is not present in the primary channel PDU
of Extended Advertising set.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix missing reset of sync create association with scan
context when associated with both 1M and Coded PHY contexts,
and sync create cancel is called.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix address resolution when trying to match the maximum
entries in the resolving list.
Wait for address resolution AAR peripheral to complete with
checking with all the entries in the IRK list.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix k_sem_give() from being called from Zero Latency IRQs
when the Controller is configured with BT_CTLR_ZLI=y.
Kernel features shall not be used from Zero Latency IRQs as
these IRQs cannot be locked by the kernel to maintain
context safety of the kernel objects.
Relates to commit 92e017fd70 ("Bluetooth: controller:
split: Support Zero Latency IRQs") and
commit c842eef3ae ("Bluetooth: controller: Add semaphore
to indicate free AD data buffers").
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
sw_switch implementation uses two parallel groups of
PPIs connecting radio and timer tasks and events.
The groups are used interchaneably, one is set for
following radio TX/RX event while the other is in use
(enabled).
The group should be disabled by timer compare event that
starts Radio to TX/RX a PDU. The timer is responsible for
maintenance of TIFS/TMAFS. The disabled group collects
all PPIs required to maintain the TIFS/TMASF. After
the time is reached Radio is started and the group is
disabled. It will be enabled again by software radio
swich during next call.
If the group is not disabled then it will work in parallel
to other one. That causes issues in correct maintenance of
instant when radio shoudl be started for next TX/RX event
e.g. radio may be enabled to early.
In case the PHY CODED was enabled and periodic advertising
included chained PDUs, that are transmitted back-to-back,
there was missing group delay disable. The missing case was
sw_switch function called with dir_curr and dir_next set
to SW_SWITCH_TX.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Fix missing call to ISOAL sink instance destroy interface,
without this there is leak in ISOAL sink instances when
removing ISO data path.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
[*] Fixed setting of SDU production status when exiting the
ISOAL_ERR_SPOOL state for framed PDU consumption when receiving the
start of the next SDU
[*] Changed condition identifying a padding PDU to include padding PDUs
with errors received after the end fragment is seen and expanded
unit tests to cover new condition
[*] Changed definition of ISOAL_PDU_STATUS_xxx errors to match value of
similar errors defined for the SDU status
Signed-off-by: Nirosharn Amarasinghe <niag@demant.com>
Improvement to generate Tx ack early when the event close
compared to being done at the start of the next event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix Extended Advertising conditional compiles in header files.
Do not conditional compile declarations, definitions of
functions in source files only be compiled out.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Fix to include ll_adv_cmds_set when broadcast role is not
enabled in the Controller but advertising extensions is
enabled (Extended Scanning is used).
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Rename the use of mstr word in advanced scheduling
implementation to cen as a representation for Central
role.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Use connection interval units of 1250 us for periodic
scheduling of Extended Advertising auxiliary PDU events so
that auxiliary events can be periodically grouped alongwith
the Periodic Advertising Events. This will permit
mitigating overlaps amongst them.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>
Add implementation to find free slot after Periodic
Advertising event, to place the BIG event.
Signed-off-by: Vinayak Kariappa Chettimada <vich@nordicsemi.no>