Instead of storing the calculated reload value (in conn intervals) in
the conn object, now store the timeout value, and perform calculation
when used. This allows using the timeout value across all CIS's without
having to re-calc and store on change of TO
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Unit tests does not maintain connection events hence there is no
notification to PHY upodate state machine about instant on air
event. That has to be simulated by explicit call to ull_cp_tx_nrf.
In unit tests the event_done function is responsible for handling
all steps done at end of connection event, so it is the best place
to simulate the instant on air event and send it to LLCP state machine.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Implements PDU flow and unittest of CIS Create on Peripheral
Hooks CIS Create into the controller and fixes a few minor
things in ull to allow for running with NEW LLCP
Also handles CONFIG based comilation of CIS Create
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Hooks the CIS terminate into the controller and fixes a few minor
things in ull_conn(_iso).c
Also handles CONFIG based comilation of CIS_TERMINATE
also fixes a minor issue in helpers_pdu
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
In order to bring consistency in-tree, migrate all tests to the new
prefix <zephyr/...>. Note that the conversion has been scripted, refer
to #45388 for more details.
Signed-off-by: Gerard Marull-Paretas <gerard.marull@nordicsemi.no>
Move include paths and add new target_include_directories to support
backwards compatibility:
* /include -> /include/zephyr
example: <irq.h> -> <zephyr/irq.h>
Issue #41543
Signed-off-by: Yuval Peress <peress@google.com>
Getting rid of TODOs that are fairly straight forward to resolve
* introduce role checks in ENC API
* Remove ASSERT on re-rx of LL_VERSION_IND, ignore instead
* in tests/.../ctrl_chmu: rename variable and initialize initial ch map
* in tests/.../mock_ctrl/util.c: Changing TODO into FYI
* in tests/.../helper_features.h update mask and remove TODO comment
* in ull_llcp_remote.c: re-order cases in proc_with_instant switch
* in ull_conn_upd.c: PARAM REQ only uses REJECT_EXT_IND
* in ull_llcp_common.c: in CENTRAL on rx of LL_MIN_USED_CHANNELS_IND
chose to do nothing re. channel map. Update unit test accordingly
Signed-off-by: Erik Brockhoff <erbr@oticon.com>
Add a separate procedure context pool for remote initiated procedures.
Make it configurable in size by BT_CTLR_LLCP_REMOTE_PROC_CTX_BUF_NUM.
Fix all unit tests referring to the amount of free context buffers.
Fixes#41823
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
Test the rejection (LL_UNKNOWN_RSP) of invalid remotely initiated
procedures in both the central and peripheral role.
Signed-off-by: Thomas Ebert Hansen <thoh@oticon.com>
The abbreviations cen and per may be confusing, so they are
expanded into central and peripheral
Signed-off-by: Andries Kruithof <Andries.Kruithof@nordicsemi.no>
There were some references to slave and master left in the unittests
for the refactored LLCP.
These are changed in respectively peripheral and central
Signed-off-by: Andries Kruithof <Andries.Kruithof@nordicsemi.no>
There were changes done to controller code that cause
tests to do not build and fail during execution.
Changes are related with:
- modified code related with extended advertising ADI
field handling
- added generic double buffer data structure that is
used in controller
- moved code that was building only when DF is enabled
- added EVENTS_PHYEND that is not available in nrfbsim
board
The PR addresses those issues.
Signed-off-by: Piotr Pryga <piotr.pryga@nordicsemi.no>
Rename the mockup file from ull_periph.c into ull_peripheral.c
so that it has the same name as its equivalent in the BT
controller
Signed-off-by: Andries Kruithof <Andries.Kruithof@nordicsemi.no>
Pushes all work done in the topic-ble-llcp branch into main branch
This is a refactoring of the LL control procedures; the refactored
control procedures are hidden behind a KConfig option and
per default disabled
Goal of the refactoring:
close issue Link Layer Control Procedure overhaul #15256
make it easier to add/update control procedures
Refactoring consists in principal of writing explicit state machines
for the control procedures.
To reduce the risk of regression errors unit-tests have been added
Following control procedures are implemented:
Connection update procedure
Channel map update procedure
Encryption procedure
Feature exchange procedure
Version exchange procedure
ACL termination procedure
Connection parameters request procedure
LE Ping procedure
Data Length Update procedure
PHY update procedure
Min. nr. Of channels used procedure
Constant Tone extension request procedure
This is a joined work by the people listed in the signed-off-by
list (in alphabetical order)
Signed-off-by: Andries Kruithof Andries.Kruithof@nordicsemi.no
Signed-off-by: Erik Brockhoff erbr@oticon.com
Signed-off-by: Piotr Pryga piotr.pryga@nordicsemi.no
Signed-off-by: Szymon Janc szymon.janc@codecoup.pl
Signed-off-by: Thomas Ebert Hansen thoh@oticon.com
Signed-off-by: Tommie Skriver tosk@demant.com
Signed-off-by: Andries Kruithof <Andries.Kruithof@nordicsemi.no>